NPDES GAR39766F · Clean Water Act
TIMBERLAND PHASE 3, Waverly Hall, GA: NPDES GAR39766F discharge permit, effluent exceedances, inspections, penalties
TIMBERLAND PHASE 3, Waverly Hall, Georgia: General permit coverage GAR39766F, held by David McEldoon; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR39766F. David McEldoon holds 2 permits in Georgia.
Other permits held by David McEldoon
- TIMBERLAND PHASE 3, Waverly Hall: GAR397670, issued 2023-08-01
Coverages issued nearest GAR39766F
- 2023-08-01: LOT 14 CHAPEL SPRINGS, Eatonton: GAR39766A, held by SMITHBUILT OF LAKE OCONEE
- 2023-08-01: 1 LOCH HAVEN, Eatonton: GAR39766B, held by SMITHBUILT OF LAKE OCONEE
- 2023-08-01: THE NORTH ACRES, Valdosta: GAR39766C, held by CLINT JOYNER
- 2023-08-01: BARNSLEY RESIDENCE, Adairsville: GAR39766D, held by Boot Holdings 2022 LLC
- 2023-08-01: YARBROUGH RESIDENCE, Eatonton: GAR39766E, held by Mark Yarbrough
- 2023-08-01: TIMBERLAND PHASE 3, Waverly Hall: GAR397670, held by David McEldoon
- 2023-08-01: LOT 276 CUMBERLAND HARBOR, St Marys: GAR397671, held by Kingsland
- 2023-08-01: LOT 433 CUMBERLAND HARBOR, St Marys: GAR397672, held by Trevor
- 2023-08-01: MCBRAYER RESIDENCE, Eatonton: GAR397673, held by Christopher Brayer
- 2023-08-01: LAKE PAMONA ROAD SUBDIVISION, Midway: GAR397674, held by Jake Reynolds
TIMBERLAND PHASE 3 among its neighbors
17 discharge permits are in the Ossahatchie Creek subwatershed (HUC 031300021206); GAR39766F is one.
Other permits in the Ossahatchie Creek subwatershed (HUC 031300021206)
- ELLERSLIE PLACE SUBDIVISION, LOT 39, BLOCK B, Ellerslie: GAR349330, minor, term to 2018-07-31
- ELLERSLIE PLACE SUBDIVISION, LOT 63, BLOCK A, Ellerslie: GAR349331, minor, term to 2018-07-31
- ELLERSLIE PLACE, LOT 36B, Ellerslie: GAR369535, minor, term to 2018-07-31
- ELLERSLIE PLACE, PHASE 5, Columbus: GAR381871, minor, term to 2018-07-31
- ELLERSLIE PLACE: PHASE FOUR, Ellerslie: GAR347119, minor, term to 2018-07-31
- LOT 10 AT HIGHLAND GROVE, Catuala: GAR3967BE, minor, term to 2028-07-31
- LOT 12 SOUTHAVEN, Ellerslie: GAR347463, minor, term to 2018-07-31
- MADISON WOODS SUBDIVISION, LOT 18, Ellerslie: GAR349155, minor, term to 2018-07-31
- MASON TRACTOR CO., Waverly Hall: GAR18BE4F, minor, term to 2028-07-31
- PERKINS PARK ADDITION, Waverly Hall: GAR39757D, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TIMBERLAND PHASE 3 |
|---|---|
| Permittee | David McEldoon |
| NPDES ID | GAR39766F |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Waverly Hall, GA 31831 |
| Subwatershed | Ossahatchie Creek (HUC 031300021206) |
NPDES GAR39766F: effluent limits and exceedances
TIMBERLAND PHASE 3 (NPDES GAR39766F): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR39766F: no pollutant row on file.
NPDES GAR39766F: inspections, violations and enforcement
NPDES GAR39766F (TIMBERLAND PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR39766F
NPDES GAR39766F: one email when its EPA record changes — $99/month.
Permits near NPDES GAR39766F
NPDES GAR39766F: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.