NPDES 09R10I013 · Clean Water Act
NEW EVIDENCE STORAGE FOR GPD AT YIGO (DESIGN-BUILD), Yigo, GU: NPDES 09R10I013 discharge permit, effluent exceedances, inspections, penalties
NEW EVIDENCE STORAGE FOR GPD AT YIGO (DESIGN-BUILD), Yigo, Guam: General permit coverage 09R10I013, held by Mega United Corp. Ltd.; Construction stormwater; Effective; issued January 20, 2026, term to February 16, 2027, by U.S. EPA.
Guam holds 190 Construction stormwater coverages of this permit type in EPA’s file; 145 were issued before 09R10I013.
Coverages issued nearest 09R10I013
- 2025-12-09: FY24 PROJECT APRA HARBOR WATERFRONT REPAIRS: GLASS BREAKWATER, Piti: 09R10I00Q, held by TPC-NAN a Joint Venture
- 2025-12-09: APRA HARBOR WATERFRONT REPAIRS: SUMAY COVE, Piti: 09R10I00X, held by TPC-NAN a Joint Venture
- 2025-12-15: REPAIR AND RESTRIPE BULLARD AVENUE, HAPUTO ROAD AND HOWTH STREET, MCBCB, GUAM, Dededo: 09R10I012, held by Percival Bong V. Guzman
- 2025-12-30: FY25 FHCON PROJECT H-308 & H-434 REPLACE ANDERSEN HOUSING PHASE IX & X, Yigo: 09R10I00O, held by Global Pacific Design Builders LLC
- 2026-01-20: FY25 MDA 694-1 PDI: GUAM DEFENSE SYSTEM EIAMD, Yigo: 09R10I00V, held by Black Constuction Corporation
- 2026-01-20: P-614 JOINT CONSOLIDATED COMMUNICATIONS CENTER, Yigo: 09R10I016, held by Nan Inc.
- 2026-01-20: FY 2025 MILCON PROJECT P-411 YOUTH CENTER, Yigo: 09R10I019, held by SLSCO
- 2026-01-29: UKUDU WORKFORCE HOUSING, Dededo: 09R10I00Z, held by Core Tech International Corporation
- 2026-02-03: P2301 HSC-25 HANGAR COMPLEX, Andersen Air Force Base: 09R10I01A, held by Environmental Chemical Corporation
- 2026-02-06: PROPOSED TIRE RECYCLING, METAL STORAGE AND PROCESSING, Mangilao: 09R10I015, held by Wenefredo E. Gallega
NEW EVIDENCE STORAGE FOR GPD AT YIGO (DESIGN-BUILD) among its neighbors
106 discharge permits are in the Mataguac Spring-Frontal Pacific Ocean subwatershed (HUC 220100000100); 09R10I013 is one.
Other permits in the Mataguac Spring-Frontal Pacific Ocean subwatershed (HUC 220100000100)
- ACHO LATTE, Dededo: GUR10006Z, minor, term to 2027-02-16
- B31GS AISR-DT MET LARGE FIXED ANTENNA (LFA) PROJECT, Dededo: GUR10006L, minor, term to 2027-02-16
- BANK OF GUAM NORTHERN (FULL SERVICE) BRANCH, Dededo: 09R10I007, minor, term to 2027-02-16
- BEQ J-031 & J-033, Yigo: GUR10002B, minor, term to 2022-02-15
- CLEARING AND GRADING OF LOT 5040-3, Dededo: GUR10008M, minor, term to 2027-02-16
- CLEARING AND TEMPORARY STOCKPILING AT LOT 5316-R3NEW-3, ROUTE 3 DEDEDO GUAM, Dededo: GUR100052, minor, term to 2027-02-16
- COAST 360 FCU UPPER TUMON BRANCH, Upper Tumon: GUR10004E, minor, term to 2027-02-16
- CONSTRUCT READY-MIX CONCRETE BATCH PLANT, LOT 5035-R8, Dededo: GUR10005G, minor, term to 2027-02-16
- CONTRACT N62742-21-D-1325, J-008 FIRE STATION, MARINE CORPS BASE, GUAM, Dededo: GUR10003O, minor, term to 2022-02-15
- FY 2025 MILCON PROJECT P-411 YOUTH CENTER, Yigo: 09R10I019, minor, term to 2027-02-16
What stands out
- Its term runs 1 year and 27 days, January 20, 2026 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 232 discharge permits on the register in Guam; 190 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NEW EVIDENCE STORAGE FOR GPD AT YIGO (DESIGN-BUILD) |
|---|---|
| Permittee | Mega United Corp. Ltd. |
| NPDES ID | 09R10I013 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 20, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Yigo, GU 96929 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mataguac Spring-Frontal Pacific Ocean (HUC 220100000100) |
NPDES 09R10I013: effluent limits and exceedances
NEW EVIDENCE STORAGE FOR GPD AT YIGO (DESIGN-BUILD) (NPDES 09R10I013): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES 09R10I013: no pollutant row on file.
NPDES 09R10I013: inspections, violations and enforcement
NPDES 09R10I013 (NEW EVIDENCE STORAGE FOR GPD AT YIGO (DESIGN-BUILD)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES 09R10I013
NPDES 09R10I013: one email when its EPA record changes — $99/month.
Permits near NPDES 09R10I013
NPDES 09R10I013: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.