FY24 PROJECT APRA HARBOR WATERFRONT REPAIRS: EOD POINT, Santa Rita, GU: NPDES 09R10I01C discharge permit, effluent exceedances, inspections, penalties

FY24 PROJECT APRA HARBOR WATERFRONT REPAIRS: EOD POINT, Santa Rita, Guam: General permit coverage 09R10I01C, held by TPC-NAN a Joint Venture; Construction stormwater; Effective; issued March 12, 2026, term to February 16, 2027, by U.S. EPA.

Guam holds 190 Construction stormwater coverages of this permit type in EPA’s file; 159 were issued before 09R10I01C. TPC-NAN a Joint Venture holds 4 permits in Guam.

Other permits held by TPC-NAN a Joint Venture

Coverages issued nearest 09R10I01C

FY24 PROJECT APRA HARBOR WATERFRONT REPAIRS: EOD POINT among its neighbors

25 discharge permits are in the Atantano River-Frontal Apra Harbor subwatershed (HUC 220100000303); 09R10I01C is one.

Other permits in the Atantano River-Frontal Apra Harbor subwatershed (HUC 220100000303)

What stands out

  • Its term runs 341 days, March 12, 2026 to February 16, 2027.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 232 discharge permits on the register in Guam; 190 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityFY24 PROJECT APRA HARBOR WATERFRONT REPAIRS: EOD POINT
PermitteeTPC-NAN a Joint Venture
NPDES ID09R10I01C
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedMarch 12, 2026
ExpiresFebruary 16, 2027
AgencyU.S. EPA
AddressSanta Rita, GU 96915
Receiving water impaired303(D) Listed
SubwatershedAtantano River-Frontal Apra Harbor (HUC 220100000303)

NPDES 09R10I01C: effluent limits and exceedances

FY24 PROJECT APRA HARBOR WATERFRONT REPAIRS: EOD POINT (NPDES 09R10I01C): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES 09R10I01C: no pollutant row on file.

NPDES 09R10I01C: inspections, violations and enforcement

NPDES 09R10I01C (FY24 PROJECT APRA HARBOR WATERFRONT REPAIRS: EOD POINT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES 09R10I01C

NPDES 09R10I01C: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES 09R10I01C

NPDES 09R10I01C: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.