NPDES GUR100010 · Clean Water Act
KEPCO MANGILAO SOLAR PROJECT, Mangilao, GU: NPDES GUR100010 discharge permit, effluent exceedances, inspections, penalties
KEPCO MANGILAO SOLAR PROJECT, Mangilao, Guam: General permit coverage GUR100010, held by SAMSUNG E&C AMERICA, INC.; Construction stormwater; Administratively continued; issued December 5, 2018, term to February 15, 2022, by U.S. EPA.
Guam holds 190 Construction stormwater coverages of this permit type in EPA’s file; 3 were issued before GUR100010.
Coverages issued nearest GUR100010
- 2018-02-12: J-001B FINEGAYAN UTILITIES AND SITE IMPROVEMENTS, Finegayan: GUR10000K, held by Granite-Obayashi
- 2018-02-21: ILEARN CHARTER ACADEMY, Dededo: GUR10000L, held by Core Tech International Corporation
- 2018-03-06: UMATAC - MERIZO WASTE WATER TREATMENT PLANT UPGRADE, Umatac: GUR10000M, held by Core Tech - Hawaiian Dredging, LLC
- 2019-01-03: APRA MEDICAL/DENTAL CLINIC, Naval Base: GUR100013, held by CADDELL-NAN A JV
- 2019-10-25: J-755 URBAN COMBAT TRAINING, Yigo: GUR10001K, held by CHK LLC
- 2020-06-02: BEQ J-031 & J-033, Yigo: GUR10002B, held by CADDELL-NAN JV
- 2020-08-12: FY20 MCON P-459 BEQ H, Yigo: GUR10002G, held by CADDELL-NAN JV
- 2020-12-18: LOT NO. 2491, Mangilao: GUR10002I, held by JMC Equipment Rental
KEPCO MANGILAO SOLAR PROJECT among its neighbors
106 discharge permits are in the Mataguac Spring-Frontal Pacific Ocean subwatershed (HUC 220100000100); GUR100010 is one.
Other permits in the Mataguac Spring-Frontal Pacific Ocean subwatershed (HUC 220100000100)
- ACHO LATTE, Dededo: GUR10006Z, minor, term to 2027-02-16
- B31GS AISR-DT MET LARGE FIXED ANTENNA (LFA) PROJECT, Dededo: GUR10006L, minor, term to 2027-02-16
- BANK OF GUAM NORTHERN (FULL SERVICE) BRANCH, Dededo: 09R10I007, minor, term to 2027-02-16
- BEQ J-031 & J-033, Yigo: GUR10002B, minor, term to 2022-02-15
- CLEARING AND GRADING OF LOT 5040-3, Dededo: GUR10008M, minor, term to 2027-02-16
- CLEARING AND TEMPORARY STOCKPILING AT LOT 5316-R3NEW-3, ROUTE 3 DEDEDO GUAM, Dededo: GUR100052, minor, term to 2027-02-16
- COAST 360 FCU UPPER TUMON BRANCH, Upper Tumon: GUR10004E, minor, term to 2027-02-16
- CONSTRUCT READY-MIX CONCRETE BATCH PLANT, LOT 5035-R8, Dededo: GUR10005G, minor, term to 2027-02-16
- CONTRACT N62742-21-D-1325, J-008 FIRE STATION, MARINE CORPS BASE, GUAM, Dededo: GUR10003O, minor, term to 2022-02-15
- FY 2025 MILCON PROJECT P-411 YOUTH CENTER, Yigo: 09R10I019, minor, term to 2027-02-16
What stands out
- Its term runs 3 years and 72 days, December 5, 2018 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 232 discharge permits on the register in Guam; 190 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | KEPCO MANGILAO SOLAR PROJECT |
|---|---|
| Permittee | SAMSUNG E&C AMERICA, INC. |
| NPDES ID | GUR100010 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 5, 2018 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Mangilao, GU 96913 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mataguac Spring-Frontal Pacific Ocean (HUC 220100000100) |
NPDES GUR100010: effluent limits and exceedances
KEPCO MANGILAO SOLAR PROJECT (NPDES GUR100010): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GUR100010: no pollutant row on file.
NPDES GUR100010: inspections, violations and enforcement
NPDES GUR100010 (KEPCO MANGILAO SOLAR PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GUR100010
NPDES GUR100010: one email when its EPA record changes — $99/month.
Permits near NPDES GUR100010
NPDES GUR100010: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.