NPDES HIF009886 · Clean Water Act
VILLAGES OF KAPOLEI, NOHONA III AT KAPOLEI - HOUSE CONSTRUCTION, HI: NPDES HIF009886 discharge permit, effluent exceedances, inspections, penalties
VILLAGES OF KAPOLEI, NOHONA III AT KAPOLEI - HOUSE CONSTRUCTION, Hawaii: General permit coverage HIF009886, held by Castle & Cooke Homes Hawaii, Inc.; Construction stormwater; Administratively continued; issued September 19, 2012, term to October 21, 2012, by Hawaii Dept of Health, Clean Water Branch.
Hawaii holds 850 Construction stormwater coverages of this permit type in EPA’s file; 378 were issued before HIF009886. Castle & Cooke Homes Hawaii, Inc. holds 10 permits in Hawaii.
Other permits held by Castle & Cooke Homes Hawaii, Inc.
- PUUWAI PLACE CLUSTER DEVELOPMENT (1), Waipahu: HIF011363, issued 2016-10-27
- MASS GRADING FOR KOA RIDGE DEVELOPMENT (PHASE 1A), Waipahu: HIF011439, issued 2017-01-24
- KOA RIDGE - KA UKA BOULEVARD IMPROVEMENTS, Waipahu: HIF011666, issued 2017-09-25
- KOA RIDGE - SITE A1A, Waipahu: HIF012126, issued 2018-10-02
- KOA RIDGE - SITE A1A, Waipahu: HIF012127, issued 2018-10-02
- KOA RIDGE ROAD A PHASE 1, Waipahu: HIF012128, issued 2018-10-02
- KOA RIDGE OFFSITE DRAIN LINE NO.1: HIF012153, issued 2018-10-22
- KOA RIDGE: HIF012747, issued 2020-05-15
- KOA RIDGE OFF-SITE SEWER LINES A & B (2): HIF014622, issued 2025-01-08
Coverages issued nearest HIF009886
- 2012-09-18: INTERSTATE ROUTE H-1 REHABILITATION, MIDDLE STREET TO VICINITY OF WARD AVENUE: HIF009877, held by State of Hawaii
- 2012-09-19: PALOLO VALLEY HOMES - PHYSICAL IMPROVEMENTS PHASES 1 AND 2, Honolulu: HIF009849, held by Hawaii Public Housing Authority
- 2012-09-19: MALAKOLE STOCKPILE, Kapolei: HIF009862, held by AG/CW Raceway Owner II
- 2012-09-19: ALA MOANA CENTER - EWA EXPANSION: HIF009863, held by General Growth Properties, Inc.
- 2012-09-19: FORMER MAUI SCRAP METAL STORAGE YARD LICENSE AREA: HIF009874, held by A&B Properties, Inc.
- 2012-09-19: PIILANI MAI KE KAI SUBDIVISION, PHASE II: HIF009894, held by State of Hawaii
- 2012-09-19: AINA LEA HELCO CORRIDOR, Waimea: HIF009895, held by DW AINA LE'A LLC
- 2012-09-20: 89-25 LUALUALEI HOMESTEAD ROAD: HIF009843, held by Okada Trucking Co., Ltd.
- 2012-09-20: KALAELOA DEVELOPMENT DISTRICT KALAELOA ENERGY CORRIDOR: HIF009844, held by Hawaii Community Development Authority
- 2012-09-20: KALANIANAOLE HIGHWAY RESURFACING, WEST HIND DRIVE TO VICINITY OF HANAUMA BAY ROA: HIF009846, held by State of Hawaii
VILLAGES OF KAPOLEI, NOHONA III AT KAPOLEI - HOUSE CONSTRUCTION among its neighbors
Its county: 814, 13 major; HIF009886 is minor permit.
Other permits in the county
- 'ILIMA AT LEIHANO, Kapolei: HIF009623, minor, term to 2012-10-21
- 134 NAKOLO PLACE, Unknown: HI19BF831, minor, term to 2024-05-20
- 3M HONOLULU, Honolulu: HI02BB296, minor, term to 2025-03-19
- 801 SOUTH STREET, Honolulu: HIF009869, minor, term to 2012-10-21
- 900 GREEN VALLEY, Mililani: HIF010982, minor, term to 2018-12-05
- ABF FREIGHT SYSTEM, INC. (1), Honolulu: HI15BE656, minor, term to 2025-02-10
- ACCESS AND ELECTRICAL IMPROVEMENTS - KALAELOA BARBERS POINT HARBOR, Unknown: HIF005704, minor, term to 2012-10-21
- AES HAWAII POWER PLANT DEMOLITION, Kapolei: HIF014250, minor, term to 2024-02-08
- AHUKINI MAKAI SUBDIVISION, Unknown: HIF012529, minor, term to 2024-02-08
- AIEA KAI PLACE AND WAY: 8-INCH WATER MAINS, Honolulu: HIF010830, minor, term to 2016-12-05
What stands out
- Its term runs 32 days, September 19, 2012 to October 21, 2012; the term ended 5,106 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,939 discharge permits on the register in Hawaii; 857 of them (29%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | VILLAGES OF KAPOLEI, NOHONA III AT KAPOLEI - HOUSE CONSTRUCTION |
|---|---|
| Permittee | Castle & Cooke Homes Hawaii, Inc. |
| NPDES ID | HIF009886 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 19, 2012 |
| Expires | October 21, 2012 |
| Agency | Hawaii Dept of Health, Clean Water Branch |
| Address | HI |
NPDES HIF009886: effluent limits and exceedances
VILLAGES OF KAPOLEI, NOHONA III AT KAPOLEI - HOUSE CONSTRUCTION (NPDES HIF009886): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES HIF009886: no pollutant row on file.
NPDES HIF009886: inspections, violations and enforcement
NPDES HIF009886 (VILLAGES OF KAPOLEI, NOHONA III AT KAPOLEI - HOUSE CONSTRUCTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES HIF009886
NPDES HIF009886: one email when its EPA record changes — $99/month.
Permits near NPDES HIF009886
NPDES HIF009886: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.