NPDES HIF011921 · Clean Water Act
HO'OPILI DEVELOPMENT PHASE 5 ROADWAY AND MASS GRADING IMPROVEMENTS, HI: NPDES HIF011921 discharge permit, effluent exceedances, inspections, penalties
HO'OPILI DEVELOPMENT PHASE 5 ROADWAY AND MASS GRADING IMPROVEMENTS, Hawaii: General permit coverage HIF011921, held by D.R. Horton - Schuler Homes, LLC; Construction stormwater; Administratively continued; issued April 17, 2018, term to December 5, 2018, by Hawaii Dept of Health, Clean Water Branch; discharges to HONOULIULI STREAM.
Hawaii holds 850 Construction stormwater coverages of this permit type in EPA’s file; 630 were issued before HIF011921. D.R. Horton - Schuler Homes, LLC holds 4 permits in Hawaii.
Other permits held by D.R. Horton - Schuler Homes, LLC
- THE VILLAS AT KAHOMA STREAM: HIF001110, issued 2009-06-19
- MEHANA AT KAPOLEI: HIF001699, issued 2008-05-19
- THE CITY OF KAPOLEI, MAKAI DRAINAGE CHANNEL AND KO OLINA RELIEF INTERCEPTOR SEWE: HIF005671, issued 2008-07-25
Coverages issued nearest HIF011921
- 2018-04-11: WAIMANO RIDGE SITE IMPROVEMENTS: HIF011887, held by State of Hawaii
- 2018-04-11: HO?OPILI DEVELOPMENT INDUSTRIAL MIXED USE INTERSECTION IMPROVEMENTS PROJECT: HIF011897, held by D.R. Horton - Schuler Homes LLC
- 2018-04-11: KAPOLEI MOKULANI, Kapolei: HIF011927, held by Mokulani LLC
- 2018-04-12: REHABILITATION OF LOCALIZED STREETS, PHASE 16A - ADDITIONAL STAGING AREAS: HIF011901, held by City and County of Honolulu
- 2018-04-16: HIARNG COMBINED SUPPORT MAINTENANCE SHOP #2: HIF011890, held by State of Hawaii
- 2018-04-18: ALA WAI CANAL 46KV CABLE INSTALLATION: HIF011909, held by Hawaiian Electric Company, Inc.
- 2018-04-18: MASS GRADING PLAN FOR TEMPORARY RETENTION BASIN/KAPOLEI HARBORSIDE DRAINAGE CHAN: HIF011924, held by Aina Nui Corporation
- 2018-04-19: SAND ISLAND STATE RECREATION AREA - PHASE IV PARK IMPROVEMENTS: HIF011907, held by State of Hawaii
- 2018-04-19: DIAMOND HEAD APRON RECONSTRUCTION GATES G1 TO G6 DANIEL K. INOUYE INTERNATIONAL: HIF011928, held by State of Hawaii
- 2018-04-25: KALANIANAOLE HIGHWAY RESURFACING, H-1 FREEWAY TO WEST HIND DRIVE: HIF011898, held by State of Hawaii
HO'OPILI DEVELOPMENT PHASE 5 ROADWAY AND MASS GRADING IMPROVEMENTS among its neighbors
200 discharge permits are in the Waolani Stream subwatershed (HUC 200600000304); HIF011921 is one. Its county: 814, 13 major; HIF011921 is minor permit.
Other permits in the Waolani Stream subwatershed (HUC 200600000304)
- ABF FREIGHT SYSTEM, INC. (1), Honolulu: HI15BE656, minor, term to 2025-02-10
- AIEA KAI PLACE AND WAY: 8-INCH WATER MAINS, Honolulu: HIF010830, minor, term to 2016-12-05
- AIRPORT GUIDEWAY & STATIONS DESIGN BUILD, Aiea: HIF011554, minor, term to 2024-02-08
- ALAKAWA STREET: 12-INCH WATER MAIN, Unknown: HIF014376, minor, term to 2027-01-14
- ALOHA PETROLEUM HONOLULU TERMINAL, Honolulu: HIF013587, minor, term to 2027-01-14
- ALOHA PETROLEUM LTD, Honolulu: HIF008387, minor, term to 2012-10-21
- ALOHA PETROLEUM LTD, Honolulu: HIF009667, minor, term to 2012-10-21
- ALOHA TOFU FACTORY, INC., Honolulu: HI16BF032, minor, term to 2021-07-04
- ALOHA TOOL & RENTAL INC. DBA HONOLULU RECOVERY SYSTEMS, INC. MATERIAL RECOVERY F, Unknown: HIF001827, minor, term to 2007-11-06
- AMAZON.COM SERVICES LLC - DHI2 (2), Honolulu: HIF014530, minor, term to 2027-01-14
What stands out
- Its term runs 232 days, April 17, 2018 to December 5, 2018; the term ended 2,841 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,939 discharge permits on the register in Hawaii; 857 of them (29%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HO'OPILI DEVELOPMENT PHASE 5 ROADWAY AND MASS GRADING IMPROVEMENTS |
|---|---|
| Permittee | D.R. Horton - Schuler Homes, LLC |
| NPDES ID | HIF011921 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 17, 2018 |
| Expires | December 5, 2018 |
| Agency | Hawaii Dept of Health, Clean Water Branch |
| Address | HI |
| Receiving water | HONOULIULI STREAM |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Waolani Stream (HUC 200600000304) |
NPDES HIF011921: effluent limits and exceedances
HO'OPILI DEVELOPMENT PHASE 5 ROADWAY AND MASS GRADING IMPROVEMENTS (NPDES HIF011921): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES HIF011921: no pollutant row on file.
NPDES HIF011921: inspections, violations and enforcement
NPDES HIF011921 (HO'OPILI DEVELOPMENT PHASE 5 ROADWAY AND MASS GRADING IMPROVEMENTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES HIF011921
NPDES HIF011921: one email when its EPA record changes — $99/month.
Permits near NPDES HIF011921
NPDES HIF011921: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.