EPA · discharge permits by city
Discharge permits in Donnelly, Idaho
- 12Current permits
Permits
Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.
| Permit holder | NPDES ID | Program | Discharger | Receiving water |
|---|---|---|---|---|
| BLUE MOUNTAIN SUBDIVISION | IDR10C0BQ | Construction stormwater | Minor | Cascade Reservoir |
| COPPER ROCK SUBDIVISION | IDR10C0L8 | Construction stormwater | Minor | Cascade Reservoir |
| GOLD FORK | IDR10C0UU | Construction stormwater | Minor | Gold Fork River |
| GOLD FORK (ESTATE 81 LLC.) | IDR10C0V0 | Construction stormwater | Minor | Gold Fork River |
| GOLD FORK RIVER RANCH | IDR10C1XT | Construction stormwater | Minor | Cascade Resevoir |
| STIBNITE GOLD PROJECT - BROWN PROPERTY | IDR10C1YZ | Construction stormwater | Minor | Gold Fork River |
| TAMARACK FALLS ESTATES SUBDIVISION | IDR10C14A | Construction stormwater | Minor | Cascade Reservoir |
| TIMBER CREEK RESERVE SUBDIVISION #1 | IDR10C0RX | Construction stormwater | Minor | Unnamed Tributary 1, Unnamed Tributary 2 |
| ASPEN RIDGE SUBDIVISION | IDR10038R | Construction stormwater | Minor | Poison Creek-North Fork Payette River |
| TAMARACK RESORT LLC | IDR10AB52 | Minor | ROCK CREEK, POISSON CREEK, WETLANDS | |
| TAMARACK RESORT LLC | IDR10AK66 | Minor | ROCK CREEK, POISSON CREEK, WETLANDS | |
| W & S INVESTMENTS INC | IDR10AH26 | Minor | CASCADE RESERVOIR |