NPDES IDR10003B · Clean Water Act
TETON HYUNDAI, Pocatello, ID: NPDES IDR10003B discharge permit, effluent exceedances, inspections, penalties
TETON HYUNDAI, Pocatello, Idaho: General permit coverage IDR10003B, held by HK Contractors, Inc.; Construction stormwater; Not needed.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. HK Contractors, Inc. holds 24 permits in Idaho.
Other permits held by HK Contractors, Inc.
- MTN. BEND ESTATES, Idaho Falls: IDR100006
- 17TH ST & 25TH EAST (HITT RD) INTERSECTION RECONSTRUCTION, Idaho Falls: IDR10002Z
- 7TH STREET WATER LINE REPLACEMENT, Idaho Falls: IDR1000KT
- 17TH STREET & ST CLAIR RD INTERSECTION IMPROVEMENTS, Idaho Falls: IDR1000LD
- YORKSIDE SUBDIVISION DIVISION NO.3, Idaho Falls: IDR1000MH
- I-15, OSGOOD RAMP EXIT, BONNEVILLE CO, Idaho Falls: IDR1000NL
- MOUNTAIN BEND ESTATES DIV.2, Idaho Falls: IDR1000R1
- FAIRWAY ESTATES DIVISION NO.21, Idaho Falls: IDR10011Q
- PAD BC @ SANDCREEK COMMONS, Ammon: IDR10017H
- REXBURG 2ND EAST RR TRACKS TO STATIONARY ROAD, Rexburg: IDR1001FE
TETON HYUNDAI among its neighbors
32 discharge permits are in the Pocatello Creek subwatershed (HUC 170402080506); IDR10003B is one.
Other permits in the Pocatello Creek subwatershed (HUC 170402080506)
- 8603 N PARKS RD HOUSE, Pocatello: IDR10C1QY, minor, term to 2027-02-09
- ALPINE 1C, Chubbuck: IDR10C1S7, minor, term to 2027-02-09
- BANNOCK CO EVENT CENTER PED PATH, Pocatello: IDR1001T0
- BANNOCK COUNTY EVENT CENTER PEDESTRIAN PATH, Pocatello: IDR1001U5
- BANNOCK COUNTY EVENT CENTER PEDESTRIAN PATH, Pocatello: IDR1001V0
- BEAR RIVER STORAGE, Chubbuck: IDR10I037, minor, term to 2027-02-16
- BROOKSTONE DIVISION 13, Chubbuck: IDR10L0BS
- BROOKSTONE DIVISION 14, Chubbuck: IDR10L0H7
- FARM, Pocatello: IDR1001OQ
- GREENFIELD MEADOWS DIVISION 6, City Of Pocatello: IDR10L0D9
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | TETON HYUNDAI |
|---|---|
| Permittee | HK Contractors, Inc. |
| NPDES ID | IDR10003B |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Pocatello, ID 83201 |
| Subwatershed | Pocatello Creek (HUC 170402080506) |
NPDES IDR10003B: effluent limits and exceedances
TETON HYUNDAI (NPDES IDR10003B): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10003B: no pollutant row on file.
NPDES IDR10003B: inspections, violations and enforcement
NPDES IDR10003B (TETON HYUNDAI): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10003B
NPDES IDR10003B: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10003B
NPDES IDR10003B: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.