NPDES IDR1000N8 · Clean Water Act
CASPIAN SUBDIVISION NO 1, Meridian, ID: NPDES IDR1000N8 discharge permit, effluent exceedances, inspections, penalties
CASPIAN SUBDIVISION NO 1, Meridian, Idaho: General permit coverage IDR1000N8, held by DB Development, LLC; Construction stormwater; Administratively continued; issued September 6, 2017, term to February 15, 2022, by U.S. EPA.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 8 were issued before IDR1000N8. DB Development, LLC holds 30 permits in Idaho.
Other permits held by DB Development, LLC
- CAZADOR SUBDIVISION NO. 2, Kuna: IDR1002CF, issued 2020-03-18
- FALLBROOK SUBDIVISION NO. 3 & IRRIGATION CROSSING, Star: IDR1002CJ, issued 2020-03-18
- GRAN PRADO SUBDIVISION NO 2, Meridian: IDR1002OR
- GRAN PRADO SUBDIVISION NO 2, Meridian: IDR1002OS, issued 2020-09-16
- MADRONE HEIGHTS SUBDIVISION NO. 1, Kuna: IDR1002OU, issued 2020-09-16
- SPRINGHILL SUBDIVISION NO. 2, Meridian: IDR1002OV, issued 2020-09-16
- STAR RIVER RANCH SUBDIVISION NO. 2, Star: IDR1002TD, issued 2020-11-23
- SPRINGHILL SUBDIVISION NO. 3, Meridian: IDR1002W4, issued 2021-01-18
- CAZADOR SUBDIVISION PHASE 3 & 4, Kuna: IDR1002YQ, issued 2021-02-23
- SOUTHRIDGE SUBDIVISION PHASE 4, Meridian: IDR1002YR, issued 2021-02-23
Coverages issued nearest IDR1000N8
- 2017-05-15: CENTURY FARM COMMERCIAL/OFFSITE, Meridian: IDR10007U, held by Brighton Development Inc.
- 2017-05-16: TM CROSSING #1 / #2, Meridian: IDR100084, held by Smith Brighton Inc
- 2017-06-15: HARVEST HILLS ADDITION PHASE 1, Moscow: IDR1000FV, held by Harvest Hills Development Corp.
- 2017-06-28: KOOTENAI RIVER FLOODPLAIN RECONNECTION PROJECT - NIMZ RANCH CENTRAL QUADRANT, Bonners Ferry: IDR10I00D, held by Kootenai Tribe of Idaho
- 2017-08-22: LOGOS SCHOOL, Moscow: IDR1000M3, held by Logos School
- 2017-10-05: IDAHO YOUTH RANCH - TREASURE VALLEY RANCH IMPROVEMENTS, Caldwell: IDR1000PI, held by Granite Excavation, Inc.
- 2017-11-03: CARTWRIGHT RANCH, Boise: IDR1000RZ, held by Toll Bros Inc
- 2017-11-17: STERLING RANCH, Kuna: IDR1000SM, held by Toll Bros Inc
- 2017-12-04: SNOQUALMIE RIVER NO. 1, Eagle: IDR1000TR, held by White Sturgeon LLC
- 2017-12-04: SNOQUALMIE FALLS NO. 9, Eagle: IDR1000TX, held by White Sturgeon LLC
CASPIAN SUBDIVISION NO 1 among its neighbors
360 discharge permits are in the Mason Creek subwatershed (HUC 170501140407); IDR1000N8 is one.
Other permits in the Mason Creek subwatershed (HUC 170501140407)
- 10 MILE RETAIL, Meridian: IDR10037Z
- 1209 ANDY LANE TRUCK YARD, Caldwell: IDR1002I9
- 17270 NORTHSIDE BOULEVARD, Nampa: IDR10L0KV
- 22102 FRANKLIN BLVD & KARCHER RD INT, Nampa: IDR10L0E1
- 4-LOT FLEX BUILDING SUBDIVISION, Caldwell: IDR1002R2
- 500 LATERAL RELOCATION, Caldwell: IDR10026E
- 620 N. 39TH STREET NORTH BUILDING, Nampa: IDR10L07V
- ABC ROOFING SUPPLY COMPANY, Nampa: IDR1000K1
- ADAMS RIDGE APARTMENTS, Nampa: IDR10C27V, minor, term to 2027-02-09
- ADAMS RIDGE SUBDIVISION NO 7, Nampa: IDR10C0UC, minor, term to 2027-02-09
What stands out
- Its term runs 4 years and 162 days, September 6, 2017 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CASPIAN SUBDIVISION NO 1 |
|---|---|
| Permittee | DB Development, LLC |
| NPDES ID | IDR1000N8 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 6, 2017 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Meridian, ID 83642 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mason Creek (HUC 170501140407) |
NPDES IDR1000N8: effluent limits and exceedances
CASPIAN SUBDIVISION NO 1 (NPDES IDR1000N8): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR1000N8: no pollutant row on file.
NPDES IDR1000N8: inspections, violations and enforcement
NPDES IDR1000N8 (CASPIAN SUBDIVISION NO 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR1000N8
NPDES IDR1000N8: one email when its EPA record changes — $99/month.
Permits near NPDES IDR1000N8
NPDES IDR1000N8: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.