NPDES IDR100114 · Clean Water Act
BROADMORE INDUSTRIAL PARK COMPLEX, Nampa, ID: NPDES IDR100114 discharge permit, effluent exceedances, inspections, penalties
BROADMORE INDUSTRIAL PARK COMPLEX, Nampa, Idaho: General permit coverage IDR100114, held by Silver Linings, LLC; Construction stormwater; Administratively continued; issued March 30, 2018, term to February 15, 2022, by U.S. EPA.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 18 were issued before IDR100114.
Coverages issued nearest IDR100114
- 2017-12-04: SNOQUALMIE FALLS NO. 9, Eagle: IDR1000TX, held by White Sturgeon LLC
- 2018-02-12: MASON CREEK SUBDIVISION, Nampa: IDR1000XA, held by Prestige Homes, Inc.
- 2018-02-28: REDFISH LAKE TO STANLEY TRAIL, ID FS SAW T 2017(1), Stanley: IDR1000YW, held by FHWA - Western Federal Lands Highway Division
- 2018-03-09: BARNWOOD SUBDIVISION NO. 1, Boise: IDR1000Z6, held by Challenger Development, Inc.
- 2018-03-13: ECHELON RIDGE, Boise: IDR1000ZP, held by Granite Excavation Inc.
- 2018-04-17: BICENTENNIAL FARM, Meridian: IDR10012B, held by Toll Bros Inc
- 2018-04-30: AVIMOR VILLAGE I, Boise: IDR10013M, held by Avimor Development LLC
- 2018-05-08: LAKEMOOR #8, Eagle: IDR10014C, held by C&O Development
- 2018-05-21: THE FAIRWAYS AT WHITETAIL CLUB, Mccall: IDR10014N, held by Resort Concepts
- 2018-07-02: STC-1739, E. ONEIDA ST., PRESTON, Preston: IDR100190, held by Local Highway Technical Assistance Council
BROADMORE INDUSTRIAL PARK COMPLEX among its neighbors
358 discharge permits are in the Lower Indian Creek subwatershed (HUC 170501140507); IDR100114 is one.
Other permits in the Lower Indian Creek subwatershed (HUC 170501140507)
- 11TH AVE S 2-WAY CONVERSION CITY OF NAMPA, Nampa: IDR10L0LN
- 11TH AVE S TWO-WAY CONVERSION, Nampa: IDR10L0LO
- 12TH-15TH 2ND-7TH ST. SOUTH WATERLINES REPLACEMENT, Nampa: IDR10C27N, minor, term to 2027-02-09
- 1908 SUNNY RIDGE, Nampa: IDR1001JD
- 1ST ST. & ROOSEVELT AVE. WATERLINE, Nampa: IDR1000GJ
- 2025 ARTERIAL & COLLECTOR CAPITAL MAINTENANCE, Kuna: IDR10C1UW, minor, term to 2027-02-09
- 203 AND 212 1ST AVE., Nampa: IDR10L0J9
- 21ST AVENUE MARRIOTT, Caldwell: IDR10C1IN, minor, term to 2027-02-09
- 24229 MIDDLETON RD, SH 55 TO FLAMINGO AVE, Nampa: IDR10L0LR
- 6TH STREET MULTI-PLEXES, Nampa: IDR1001D8
What stands out
- Its term runs 3 years and 322 days, March 30, 2018 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BROADMORE INDUSTRIAL PARK COMPLEX |
|---|---|
| Permittee | Silver Linings, LLC |
| NPDES ID | IDR100114 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 30, 2018 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Nampa, ID 83687 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lower Indian Creek (HUC 170501140507) |
NPDES IDR100114: effluent limits and exceedances
BROADMORE INDUSTRIAL PARK COMPLEX (NPDES IDR100114): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR100114: no pollutant row on file.
NPDES IDR100114: inspections, violations and enforcement
NPDES IDR100114 (BROADMORE INDUSTRIAL PARK COMPLEX): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR100114
NPDES IDR100114: one email when its EPA record changes — $99/month.
Permits near NPDES IDR100114
NPDES IDR100114: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.