Clean Water Act discharge permit · NPDES IDR100146
2018 ROADWAY AND PEDESTRIAN IMPROVMENTS, Boise, ID: NPDES IDR100146 discharge permit, effluent exceedances, inspections, penalties
- Not neededPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
2018 ROADWAY AND PEDESTRIAN IMPROVMENTS, held by Ada County Highway District, holds NPDES permit IDR100146. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for 2018 ROADWAY AND PEDESTRIAN IMPROVMENTS: its NPDES ID, its permit type and status, its its address in Boise, Idaho. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR100146.
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility as filed | 2018 ROADWAY AND PEDESTRIAN IMPROVMENTS |
|---|---|
| Permittee as filed | Ada County Highway District |
| NPDES ID | IDR100146 |
| Permit status | Not needed |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Address | Boise, ID 83714 |
| Subwatershed | Fivemile Creek (HUC 170501140202) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR100146.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR100146.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR100146.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR100146.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR100146.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR100146 there.
2018 ROADWAY AND PEDESTRIAN IMPROVMENTS, Boise, Idaho: Coverage under a general permit IDR100146, held by Ada County Highway District; Construction stormwater; Not needed.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Ada County Highway District holds 36 permits in Idaho.
Other permits held by Ada County Highway District
- W 4TH STREET, BROADWAY AVE TO MAPLE AVE, Meridian: IDR100011
- CAMERON @ FAIRFIELD PEDESTRIAN IMPROVEMENTS PROJECTS, Boise: IDR10009W
- ALPINE ST, ORCHARD ST TO RANDALL ST, Boise: IDR10009X
- PLAZA DRIVE EXPANSION, Eagle: IDR1000AF
- JEFFERSON ST. AND MADISON ST FROM WHITEWATER PARK TO 27TH ST, Boise: IDR1000G7
- W CAMAS ST PEDESTRIAN IMPROVEMENTS, Boise: IDR1000G8
- EMERALD ST. & AMERICANA BLVD. IMPROVEMENTS, Boise: IDR1000Y1
- ORCHARD ST. INTERIM TRAFFIC IMPROVEMENTS, Boise: IDR10012E
- 2018 RESIDENTIAL CAPITAL MAINTENANCE, Boise: IDR100138
- BOGUS BASIN ROAD SAFETY, MAINTENANCE, AND TRAIL HEAD, Boise: IDR10016B
2018 ROADWAY AND PEDESTRIAN IMPROVMENTS among its neighbors
184 discharge permits are in the Fivemile Creek subwatershed (HUC 170501140202); IDR100146 is one.
Other permits in the Fivemile Creek subwatershed (HUC 170501140202)
- 2370 S MAPLE GROVE, Boise: IDR10C08U, minor, term to 2027-02-09
- 2406 LIBERTY STREET, BOISE, IDAHO 83709, Boise: IDR1002DQ
- 9100 S. EISENMAN DEMOLITION, Boise: IDR1001WO
- ABF FREIGHT SYSTEM, INC., Boise: IDNOEJ00U, minor, term to 2025-03-10
- ACHD APPLE - MAINTENANCE AND OPERATIONS FACILITY, Boise: IDR10C1CR, minor, term to 2027-02-09
- AIR PLANE HANGER, Boise: IDNOEJ01G
- ALBERTSONS COMPANIES INC. (ACI) BOISE AIR TERMINAL, Boise: IDR05J01B, minor, term to 2026-02-28
- AMAZON.COM SERVICES LLC- BOI5, Boise: IDR05J101, minor, term to 2026-02-28
- AZEK CO WESTING FACILITY RAIL SIDING ADDITION, Boise: IDR10C011, minor, term to 2022-02-16
- B28, Boise: IDR10C1XL, minor, term to 2027-02-09
Nearby on the register
- Discharge permits in Boise
- Every permit record in Boise, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
Violation records are on file for 0.0% of the 314 storm water construction permits in Boise, including 2018 ROADWAY AND PEDESTRIAN IMPROVMENTS. The Fivemile Creek subwatershed lists 184 NPDES permits. Ada County Highway District appears as permittee on this Boise entry.