Clean Water Act discharge permit · NPDES IDR1001CS
WEST BOISE SEWER TRUNK REALIGNMENT, Boise, ID: NPDES IDR1001CS discharge permit, effluent exceedances, inspections, penalties
- Not neededPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
WEST BOISE SEWER TRUNK REALIGNMENT, held by City of Boise, holds NPDES permit IDR1001CS. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for WEST BOISE SEWER TRUNK REALIGNMENT: its NPDES ID, its permit type and status, its its address in Boise, Idaho. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR1001CS.
What stands out
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility as filed | WEST BOISE SEWER TRUNK REALIGNMENT |
|---|---|
| Permittee as filed | City of Boise |
| NPDES ID | IDR1001CS |
| Permit status | Not needed |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Address | Boise, ID 83714 |
| Subwatershed | North Slough-Boise River (HUC 170501140404) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR1001CS.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR1001CS.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR1001CS.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR1001CS.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR1001CS.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR1001CS there.
WEST BOISE SEWER TRUNK REALIGNMENT, Boise, Idaho: Coverage under a general permit IDR1001CS, held by City of Boise; Construction stormwater; Not needed.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. City of Boise holds 6 permits in Idaho.
Other permits held by City of Boise
- WEST BOISE SEWER TRUNK REALIGNMENT, Boise: IDR1000VU
- WEST BOISE WRF INTERIOR ROADWAY EXTENSION, Boise: IDR1001CR
- GLACIER SEWER EXTENSION, Boise: IDR1002VY
- RSP 332 HP TRUNK SEWER REHABILITATION PROJECT, Boise: IDR100369
- CAPITAL BLVD. GEOTHERMAL PIPE REPAIR, Boise: IDR10C1KI, issued 2022-01-10
WEST BOISE SEWER TRUNK REALIGNMENT among its neighbors
223 discharge permits are in the North Slough-Boise River subwatershed (HUC 170501140404); IDR1001CS is one.
Other permits in the North Slough-Boise River subwatershed (HUC 170501140404)
- 106 W. 53RD ST., Garden City: IDR1001QA
- 112 RIVERSEDGE DRIVE, Eagle: IDR10C27E, minor, term to 2027-02-09
- 323003 TVR1 TACO 1701 CHIB-05 CHINDEN CAMPUS PARKING LOTS, Boise: IDR10C1K5, minor, term to 2027-02-09
- 35TH STREET WATER MAIN REPLACEMENT, Garden City: IDR10C1R3, minor, term to 2027-02-09
- 45TH PLACE SUBDIVISION, Garden City: IDR10C1W8, minor, term to 2027-02-09
- 4658 & 4526 WEST OLD VALLEY ROAD, Eagle: IDR10C1VR, minor, term to 2027-02-09
- A SHELL ADDITION FOR VN PROPERTIES, Boise: IDR1002NN
- ACHD EAGLE & STATE ST PH I, Eagle: IDR10L0F7
- ADA COUNTY GLENWOOD PATHWAY RESTORATION 2025, Garden City: IDR10L0IZ
- ADA COUNTY HIGHWAY DISTRICT MS4, Boise: IDS028185, minor, term to 2014-10-14
Nearby on the register
- Discharge permits in Boise
- Every permit record in Boise, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
Violations are on file for 0.0% of the 314 storm water construction permits in Boise, a group that includes WEST BOISE SEWER TRUNK REALIGNMENT. The North Slough-Boise River subwatershed holds 223 NPDES permits, counting WEST BOISE SEWER TRUNK REALIGNMENT. Boise's storm water construction count on EPA's register is 314 permits, with WEST BOISE SEWER TRUNK REALIGNMENT among them.