Velarion Records
Free: one email when NPDES IDR1001JC changes. Unsubscribe any time.

NPDES IDR1001JC · Clean Water Act

KINGS POINT CAMPGROUND, Cascade, ID: NPDES IDR1001JC discharge permit, effluent exceedances, inspections, penalties

KINGS POINT CAMPGROUND, Cascade, Idaho: General permit coverage IDR1001JC, held by Jon Whipple; Construction stormwater; Not needed.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Jon Whipple holds 2 permits in Idaho.

Other permits held by Jon Whipple

KINGS POINT CAMPGROUND among its neighbors

5 discharge permits are in the Lower Big Creek subwatershed (HUC 170501230504); IDR1001JC is one.

Other permits in the Lower Big Creek subwatershed (HUC 170501230504)

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.

Identity

FacilityKINGS POINT CAMPGROUND
PermitteeJon Whipple
NPDES IDIDR1001JC
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressCascade, ID 83611
SubwatershedLower Big Creek (HUC 170501230504)

NPDES IDR1001JC: effluent limits and exceedances

KINGS POINT CAMPGROUND (NPDES IDR1001JC): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR1001JC: no pollutant row on file.

NPDES IDR1001JC: inspections, violations and enforcement

NPDES IDR1001JC (KINGS POINT CAMPGROUND): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR1001JC

NPDES IDR1001JC: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR1001JC

NPDES IDR1001JC: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.