NPDES IDR1001KX · Clean Water Act
MIDDLETON CANAL REPLACEMENT PROJECT, Middleton, ID: NPDES IDR1001KX discharge permit, effluent exceedances, inspections, penalties
MIDDLETON CANAL REPLACEMENT PROJECT, Middleton, Idaho: General permit coverage IDR1001KX, held by Warrington Construction; Construction stormwater; Not needed.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Warrington Construction holds 6 permits in Idaho.
Other permits held by Warrington Construction
- MARSING WATERLINE RELOCATION, Marsing: IDR1001L5
- JASPER SUBDIVISION, Mccall: IDR1001V8
- NW 7TH ST. AT N. WHITLEY DR., Fruitland: IDR1002EF
- HIGHLAND HEIGHTS SUBDIVISION (WARRINGTON CONSTRUCTION), Fruitland: IDR10C1WX, issued 2022-01-10
- HOMEDALE WATER IMPROVEMENTS, Homedale: IDR10C1XE, issued 2022-01-10
MIDDLETON CANAL REPLACEMENT PROJECT among its neighbors
197 discharge permits are in the Mill Slough-Boise River subwatershed (HUC 170501140410); IDR1001KX is one.
Other permits in the Mill Slough-Boise River subwatershed (HUC 170501140410)
- 1ST STREET TOWNHOMES SUBDIVISION, Star: IDR10C20H, minor, term to 2027-02-09
- 2684 BEACON LIGHT IMPROVEMENT PROJECT, Eagle: IDR10C1O0, minor, term to 2027-02-09
- 9335 SH-44 4 ACRE LOT, Middleton: IDR1002ZU
- ACHD LINDRE: SH44 TO FLOATING FEATHER, Eagle: IDR10C1TT, minor, term to 2027-02-09
- AMBERLY RANCH SUBDIVISION, Eagle: IDR10L0FX
- AMERICAN STAR SUBDIVISION NO. 2, Star: IDR1002TO, minor, term to 2022-02-15
- AMERICAN STAR SUBDIVISION NO. 3, Star: IDR10C05M, minor, term to 2022-02-16
- ARTESIAN SPRINGS SUBDIVISION, Middleton: IDR10C1JY, minor, term to 2027-02-09
- ARVORY CREST SUBDIVISION PHASE 4, Star: IDR10C1YC, minor, term to 2027-02-09
- BALD EAGLE POINTE SUBDIVISION NO. 1, Eagle: IDR1002PH, minor, term to 2022-02-15
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | MIDDLETON CANAL REPLACEMENT PROJECT |
|---|---|
| Permittee | Warrington Construction |
| NPDES ID | IDR1001KX |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Middleton, ID 83644 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mill Slough-Boise River (HUC 170501140410) |
NPDES IDR1001KX: effluent limits and exceedances
MIDDLETON CANAL REPLACEMENT PROJECT (NPDES IDR1001KX): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR1001KX: no pollutant row on file.
NPDES IDR1001KX: inspections, violations and enforcement
NPDES IDR1001KX (MIDDLETON CANAL REPLACEMENT PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR1001KX
NPDES IDR1001KX: one email when its EPA record changes — $99/month.
Permits near NPDES IDR1001KX
NPDES IDR1001KX: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.