NPDES IDR10020N · Clean Water Act
FY19 CAPITAL MAINTENANCE PHASE 2, Boise, ID: NPDES IDR10020N discharge permit, effluent exceedances, inspections, penalties
FY19 CAPITAL MAINTENANCE PHASE 2, Boise, Idaho: General permit coverage IDR10020N, held by Central Paving Co., Inc.; Construction stormwater; Not needed.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Central Paving Co., Inc. holds 16 permits in Idaho.
Other permits held by Central Paving Co., Inc.
- SH-55, OVERHEAD MESSAGE SIGN TO AVIMOR, Boise: IDR100036
- SH-67, MP 0 TO JCT 51, ELMORE COUNTY, IDAHO, Mountain Home: IDR1000AE
- I-84, CLEFT TO MP 90, ELMORE COUNTY, Mountain Home: IDR1000LM
- FORSYTHIA PLACE SUBDIVISION, Boise: IDR100163
- BOGUS BASIN ROAD SAFETY, MAINTENANCE AND TRAIL HEAD, Boise: IDR10016N
- MATERIAL CRUSHING AT OW-109S, Marsing: IDR10017W
- COLUMBUS, KOOTENAI, AND OVERLAND PEDESTRIAN IMPROVEMENTS, Boise: IDR1001LF
- ST. LUKE'S OFFSITE ROADWAYS - PHASE 2, Boise: IDR1001PI
- KUNA SCHOOL DISTRICT LINDER AND COLUMBIA ROADWAY IMPROVEMENT PROJECT, Kuna: IDR1002FH
- EXPO IDAHO GREENBELT PATHWAY 2020, Boise: IDR1002H1
FY19 CAPITAL MAINTENANCE PHASE 2 among its neighbors
141 discharge permits are in the South Slough-Boise River subwatershed (HUC 170501140405); IDR10020N is one.
Other permits in the South Slough-Boise River subwatershed (HUC 170501140405)
- 2ND SPACE STORAGE, Meridian: IDR10C1G9, minor, term to 2027-02-09
- 4120 N. LINDER RD. COMMERCIAL, Meridian: IDR10035O, minor, term to 2022-02-15
- 55 RESORT AT VERANO PLACE, Meridian: IDR10C06V, minor, term to 2022-02-16
- ACHD CT226-07: LIBERTY ST: DOUGLAS ST. TO DENTON ST., Boise: IDR10C1VT, minor, term to 2027-02-09
- ADDISON CIRCLE SUBDIVSION, Meridian: IDR10C1R9, minor, term to 2027-02-09
- ADERO PARK SUBDIVISION NO 2, Meridian: IDR10C1UM, minor, term to 2027-02-09
- ADERO PARK SUBDIVISION NO 2, Meridian: IDR10C1UN, minor, term to 2027-02-09
- ALICIA COURT SUBDIVISION, Meridian: IDR10024C
- ALPINE ST, ORCHARD ST TO RANDALL ST, Boise: IDR100071
- AMBLESIDE SUBDIVISION NO 1, Boise: IDR100376
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | FY19 CAPITAL MAINTENANCE PHASE 2 |
|---|---|
| Permittee | Central Paving Co., Inc. |
| NPDES ID | IDR10020N |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Boise, ID 83704 |
| Subwatershed | South Slough-Boise River (HUC 170501140405) |
NPDES IDR10020N: effluent limits and exceedances
FY19 CAPITAL MAINTENANCE PHASE 2 (NPDES IDR10020N): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10020N: no pollutant row on file.
NPDES IDR10020N: inspections, violations and enforcement
NPDES IDR10020N (FY19 CAPITAL MAINTENANCE PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10020N
NPDES IDR10020N: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10020N
NPDES IDR10020N: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.