Clean Water Act discharge permit · NPDES IDR1002O0
HAZELWOOD VILLAGE SUBDIVISION NO. 18, 19, Boise, ID: NPDES IDR1002O0 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
HAZELWOOD VILLAGE SUBDIVISION NO. 18, 19, held by Skyline-HV, Inc., holds NPDES permit IDR1002O0. EPA’s file records it issued September 4, 2020 and expiring February 15, 2022. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for HAZELWOOD VILLAGE SUBDIVISION NO. 18, 19: its NPDES ID, its permit type and status, its dates, its address in Boise, Idaho. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR1002O0.
What stands out
- Its term runs 1 year and 164 days, September 4, 2020 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | HAZELWOOD VILLAGE SUBDIVISION NO. 18, 19 |
|---|---|
| Permittee as filed | Skyline-HV, Inc. |
| NPDES ID | IDR1002O0 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | September 4, 2020 |
| Expiration date | February 15, 2022 |
| Issuing agency | U.S. EPA |
| Address | Boise, ID 83709 |
| Subwatershed | Fifteen Mile Creek (HUC 170501140205) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR1002O0.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR1002O0.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR1002O0.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR1002O0.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR1002O0.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR1002O0 there.
HAZELWOOD VILLAGE SUBDIVISION NO. 18, 19, Boise, Idaho: Coverage under a general permit IDR1002O0, held by Skyline-HV, Inc.; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued September 4, 2020, term to February 15, 2022, by U.S. EPA.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 143 were issued before IDR1002O0.
Coverages issued nearest IDR1002O0
- 2020-08-19: SNOQUALMIE FALLS NO. 13, Eagle: IDR1002N2, held by Red Butte, LLC
- 2020-08-21: HILL'S CENTURY FARM NORTH NO. 1, Meridian: IDR1002N9, held by Brighton Development Inc.
- 2020-08-25: MILLHORN DEVELOPMENT, Worley: IDR1002NA, held by Verdis
- 2020-08-27: BARAYA SUBDIVISION NO. 5 & 6, Meridian: IDR1002NF, held by Challenger Development, Inc.
- 2020-09-02: SADIE CREEK SUBDIVISION NO. 2, Kuna: IDR1002NQ, held by Kine LLC
- 2020-09-04: LITTLE SKI HILL, Mccall: IDR1002O2, held by Payette Lakes Ski Club
- 2020-09-08: SH-55, SMITHS FERRY TO ROUND VALLEY, Smiths Ferry: IDR1002O7, held by M.A. DeAtley Construction
- 2020-09-09: SH-55, SMITHS FERRY TO ROUND VALLEY KN01004, Smiths Ferry: IDR1002OB, held by Idaho Transportation Department
- 2020-09-11: CITY OF POST FALLS, IDAHO WRF TERTIARY TREATMENT IMPROVEMENTS, Post Falls: IDR1002OG, held by Sletten Construction Companies
- 2020-09-15: DRY CREEK RANCH VILLAGE SUBDIVISION NO 1, Boise: IDR1002OM, held by Brookside Developers, Inc.
HAZELWOOD VILLAGE SUBDIVISION NO. 18, 19 among its neighbors
179 discharge permits are in the Fifteen Mile Creek subwatershed (HUC 170501140205); IDR1002O0 is one.
Other permits in the Fifteen Mile Creek subwatershed (HUC 170501140205)
- 1250 EAST KALISPELL ST., Meridian: IDR1002BE
- 1475 E FRANKLIN RD, Caldwell: IDR10C0FP, minor, term to 2027-02-09
- 263 MIDLAND PIT, Calwell: IDR05J007, minor, term to 2020-06-03
- 2975 E FRANKLIN ROAD, Meridian: IDR10L0AN
- A NEW MULTI-TENANT OFFICE BUILDING FOR SUNDANCE INVESTMENTS LLLP, Meridian: IDR1001PB
- ABRACADABRA SUBDIVISION NO. 2, Boise: IDR10C1TE, minor, term to 2027-02-09
- ABS SUNDRIES PARKING EXPANSION, Meridian: IDR1002A6
- ADA COUNTY CORONER'S FACILITY, Meridian: IDR10C07O, minor, term to 2027-02-09
- ADA COUNTY CORONER'S OFFICE, Meridian: IDR10C06Q, minor, term to 2022-02-16
- ADVANCED HEATING AND COOLING, Meridian: IDR10C043, minor, term to 2022-02-16
Nearby on the register
- Discharge permits in Boise
- Every permit record in Boise, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
HAZELWOOD VILLAGE SUBDIVISION NO. 18, 19 is among the 314 storm water construction permits that EPA's NPDES register lists for Boise, and 0.0% of those carry a violation on file. The Fifteen Mile Creek subwatershed holds 179 NPDES permits, this permit included. Of the 100 Boise storm water construction permits, counting this permit, 14.0% were issued before it.