Velarion Records
Free: one email when NPDES IDR1002OK changes. Unsubscribe any time.

NPDES IDR1002OK · Clean Water Act

GAMBLE ISLAND BRIDGES, Parma, ID: NPDES IDR1002OK discharge permit, effluent exceedances, inspections, penalties

GAMBLE ISLAND BRIDGES, Parma, Idaho: General permit coverage IDR1002OK, held by McAlvain Construction, Inc; Construction stormwater; Not needed.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. McAlvain Construction, Inc holds 2 permits in Idaho.

Other permits held by McAlvain Construction, Inc

GAMBLE ISLAND BRIDGES among its neighbors

3 discharge permits are in the Ashlock Gulch-Snake River subwatershed (HUC 170501150103); IDR1002OK is one.

Other permits in the Ashlock Gulch-Snake River subwatershed (HUC 170501150103)

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.

Identity

FacilityGAMBLE ISLAND BRIDGES
PermitteeMcAlvain Construction, Inc
NPDES IDIDR1002OK
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressParma, ID 83660
Receiving water impaired303(D) Listed
SubwatershedAshlock Gulch-Snake River (HUC 170501150103)

NPDES IDR1002OK: effluent limits and exceedances

GAMBLE ISLAND BRIDGES (NPDES IDR1002OK): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR1002OK: no pollutant row on file.

NPDES IDR1002OK: inspections, violations and enforcement

NPDES IDR1002OK (GAMBLE ISLAND BRIDGES): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR1002OK

NPDES IDR1002OK: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR1002OK

NPDES IDR1002OK: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.