Velarion Records
Free: one email when NPDES IDR1002VX changes. Unsubscribe any time.

NPDES IDR1002VX · Clean Water Act

PELICAN SUBDIVISION ROADWAY WIDENING, Nampa, ID: NPDES IDR1002VX discharge permit, effluent exceedances, inspections, penalties

PELICAN SUBDIVISION ROADWAY WIDENING, Nampa, Idaho: General permit coverage IDR1002VX, held by Daystar Excavation, Inc.; Construction stormwater; Not needed.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file.

PELICAN SUBDIVISION ROADWAY WIDENING among its neighbors

18 discharge permits are in the Coulee Drain-Lake Lowell subwatershed (HUC 170501140602); IDR1002VX is one.

Other permits in the Coulee Drain-Lake Lowell subwatershed (HUC 170501140602)

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.

Identity

FacilityPELICAN SUBDIVISION ROADWAY WIDENING
PermitteeDaystar Excavation, Inc.
NPDES IDIDR1002VX
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressNampa, ID 83686
SubwatershedCoulee Drain-Lake Lowell (HUC 170501140602)

NPDES IDR1002VX: effluent limits and exceedances

PELICAN SUBDIVISION ROADWAY WIDENING (NPDES IDR1002VX): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR1002VX: no pollutant row on file.

NPDES IDR1002VX: inspections, violations and enforcement

NPDES IDR1002VX (PELICAN SUBDIVISION ROADWAY WIDENING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR1002VX

NPDES IDR1002VX: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR1002VX

NPDES IDR1002VX: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.