NPDES IDR10030R · Clean Water Act
STODDARD PATH, Nampa, ID: NPDES IDR10030R discharge permit, effluent exceedances, inspections, penalties
STODDARD PATH, Nampa, Idaho: General permit coverage IDR10030R, held by City of Nampa; Construction stormwater; Not needed.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. City of Nampa holds 19 permits in Idaho.
Other permits held by City of Nampa
- FY17 WATER SYSTEM IMPROVEMENT PROJECTS, Nampa: IDR1000ZR
- 2ND & 3RD STREET SOUTH REBUILD PROJECT, Nampa: IDR10010C
- GREENHURST RD AND ELIJAH DRAIN CULVERT REPAIR, Nampa: IDR100191
- FY18 WATER SYSTEM IMPROVEMENT PROJECT-AREA 7, Nampa: IDR1001LM
- FY18 WATER SYSTEM IMPROVEMENT PROJECT, Nampa: IDR1001O1
- CITY OF - NAMPA WWTP, Nampa: IDR10C05D, issued 2021-12-16
- MIDWAY PARK PH 3, Nampa: IDR10C1EU, issued 2022-01-10
- CITY OF NAMPA USTICK CORRIDOR, Nampa: IDR10C1NP, issued 2022-01-10
- CITY OF NAMPA HEADWORKS, Nampa: IDR10C1NY, issued 2022-01-10
- CITY OF NAMPA AIRPORT, Nampa: IDR10C1RV, issued 2022-01-10
STODDARD PATH among its neighbors
358 discharge permits are in the Lower Indian Creek subwatershed (HUC 170501140507); IDR10030R is one.
Other permits in the Lower Indian Creek subwatershed (HUC 170501140507)
- 11TH AVE S 2-WAY CONVERSION CITY OF NAMPA, Nampa: IDR10L0LN
- 11TH AVE S TWO-WAY CONVERSION, Nampa: IDR10L0LO
- 12TH-15TH 2ND-7TH ST. SOUTH WATERLINES REPLACEMENT, Nampa: IDR10C27N, minor, term to 2027-02-09
- 1908 SUNNY RIDGE, Nampa: IDR1001JD
- 1ST ST. & ROOSEVELT AVE. WATERLINE, Nampa: IDR1000GJ
- 2025 ARTERIAL & COLLECTOR CAPITAL MAINTENANCE, Kuna: IDR10C1UW, minor, term to 2027-02-09
- 203 AND 212 1ST AVE., Nampa: IDR10L0J9
- 21ST AVENUE MARRIOTT, Caldwell: IDR10C1IN, minor, term to 2027-02-09
- 24229 MIDDLETON RD, SH 55 TO FLAMINGO AVE, Nampa: IDR10L0LR
- 6TH STREET MULTI-PLEXES, Nampa: IDR1001D8
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | STODDARD PATH |
|---|---|
| Permittee | City of Nampa |
| NPDES ID | IDR10030R |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Nampa, ID 83686 |
| Subwatershed | Lower Indian Creek (HUC 170501140507) |
NPDES IDR10030R: effluent limits and exceedances
STODDARD PATH (NPDES IDR10030R): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10030R: no pollutant row on file.
NPDES IDR10030R: inspections, violations and enforcement
NPDES IDR10030R (STODDARD PATH): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10030R
NPDES IDR10030R: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10030R
NPDES IDR10030R: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.