NPDES IDR10036K · Clean Water Act
FY21 CAPITAL MAINTENANCE PH 1, Boise, ID: NPDES IDR10036K discharge permit, effluent exceedances, inspections, penalties
FY21 CAPITAL MAINTENANCE PH 1, Boise, Idaho: General permit coverage IDR10036K, held by Knife River Corporation- Mountain West Division; Construction stormwater; Administratively continued; issued June 11, 2021, term to February 15, 2022, by U.S. EPA.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 314 were issued before IDR10036K. Knife River Corporation- Mountain West Division holds 14 permits in Idaho.
Other permits held by Knife River Corporation- Mountain West Division
- KUNA DOWNTOWN REVITALIZATION PROJECT, PHASE 2, Kuna: IDR1002DJ
- DWP 20-195 ROAD MAINTENANCE/REPAIR CAMPUS WIDE, Boise: IDR1002MV
- MAPLE GROVE, OVERLAND RD TO VICTORY RD, Boise: IDR1002S1, issued 2020-11-02
- EAGLE SEWER DISTRICT EFFLUENT PRESSURE LINE PHASE 4, Boise: IDR1002S6
- SOUTHERN REGIONAL LIFT STATION, Star: IDR1002W0
- TEN MILE RIDGE WATERLINE REPLACMENT PLAN, Boise: IDR1002YV
- COLE BLUFF COTTAGES, Boise: IDR1002Z5, issued 2021-03-01
- CASTLE MOUNTAIN CREEKS PUBLIC WATERLINE REPLACEMENT, Crouch: IDR1002ZM
- ANAEROBIC FLUMEWATER TREATMENT PROJECT, Nampa: IDR100316
- SOUTHPOINT DIVISION 11, Idaho Falls: IDR10037X, issued 2021-06-17
Coverages issued nearest IDR10036K
- 2021-06-08: CITY VIEW SUBDIVISION, Pocatello: IDR10036C, held by A Plus Contractors
- 2021-06-09: SUNNYVALE SUBDIVISION NO. 4, Nampa: IDR10036E, held by Sunnyvale Properties, LLC
- 2021-06-10: THE TIMBERS LUXURY APARTMENTS AT HARRIS RANCH, Boise: IDR10036F, held by Engineered Structures, Inc.
- 2021-06-10: SPRING MOUNTAIN BLVD CRABS, Mccall: IDR10036G, held by City of McCall
- 2021-06-11: SADDLEWOOD SUBDIVISION, Star: IDR10036I, held by HMH Construction
- 2021-06-11: FY21 CAPITAL MAINTENANCE PB 1, Boise: IDR10036L, held by Ada County Highway District
- 2021-06-11: LOWER TWIN LAKES SUBDIVISION, Twin Lakes: IDR10036M, held by Simco Development Group
- 2021-06-15: TOPAZ RANCH SUBDIVISION NO. 2, Caldwell: IDR10036P, held by Challenger Development, Inc.
- 2021-06-15: LEKEITIO SUBDIVISION NO. 1, Nampa: IDR10036Q, held by Hayden Homes Idaho, LLC
- 2021-06-15: DENNIS DILLON RV STORAGE, Boise: IDR10036R, held by HMH Construction, LLC
FY21 CAPITAL MAINTENANCE PH 1 among its neighbors
141 discharge permits are in the South Slough-Boise River subwatershed (HUC 170501140405); IDR10036K is one.
Other permits in the South Slough-Boise River subwatershed (HUC 170501140405)
- 2ND SPACE STORAGE, Meridian: IDR10C1G9, minor, term to 2027-02-09
- 4120 N. LINDER RD. COMMERCIAL, Meridian: IDR10035O, minor, term to 2022-02-15
- 55 RESORT AT VERANO PLACE, Meridian: IDR10C06V, minor, term to 2022-02-16
- ACHD CT226-07: LIBERTY ST: DOUGLAS ST. TO DENTON ST., Boise: IDR10C1VT, minor, term to 2027-02-09
- ADDISON CIRCLE SUBDIVSION, Meridian: IDR10C1R9, minor, term to 2027-02-09
- ADERO PARK SUBDIVISION NO 2, Meridian: IDR10C1UM, minor, term to 2027-02-09
- ADERO PARK SUBDIVISION NO 2, Meridian: IDR10C1UN, minor, term to 2027-02-09
- ALICIA COURT SUBDIVISION, Meridian: IDR10024C
- ALPINE ST, ORCHARD ST TO RANDALL ST, Boise: IDR100071
- AMBLESIDE SUBDIVISION NO 1, Boise: IDR100376
What stands out
- Its term runs 249 days, June 11, 2021 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FY21 CAPITAL MAINTENANCE PH 1 |
|---|---|
| Permittee | Knife River Corporation- Mountain West Division |
| NPDES ID | IDR10036K |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 11, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Boise, ID 83705 |
| Subwatershed | South Slough-Boise River (HUC 170501140405) |
NPDES IDR10036K: effluent limits and exceedances
FY21 CAPITAL MAINTENANCE PH 1 (NPDES IDR10036K): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10036K: no pollutant row on file.
NPDES IDR10036K: inspections, violations and enforcement
NPDES IDR10036K (FY21 CAPITAL MAINTENANCE PH 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10036K
NPDES IDR10036K: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10036K
NPDES IDR10036K: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.