NPDES IDR10C01N · Clean Water Act
IRON HORSE-SITE DEVELOPMENT, Rexburg, ID: NPDES IDR10C01N discharge permit, effluent exceedances, inspections, penalties
IRON HORSE-SITE DEVELOPMENT, Rexburg, Idaho: General permit coverage IDR10C01N, held by Depatco; Construction stormwater; Administratively continued; issued October 5, 2021, term to February 16, 2022; discharges to Texas Slough.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 420 were issued before IDR10C01N.
Coverages issued nearest IDR10C01N
- 2021-10-01: DITCH WITCH, Nampa: IDR10C01H, held by The Russell Corporation
- 2021-10-01: APEX SOUTHEAST 2, Meridian: IDR10C01J, held by Brighton Development
- 2021-10-01: CHOTIKA SUBDIVISION, Kuna: IDR10C01K, held by Don Veasey
- 2021-10-04: NEWBURGH, Placerville: IDR10L00V, held by Loomis Homes, Inc.
- 2021-10-04: PACIFIC FIBRE, Weiser: IDR10L00W, held by Idaho Materials & Construction
- 2021-10-05: NORTH RANCH INDUSTRIAL PARK PHASE 1, Caldwell: IDR10C01O, held by McAlvain Construction Inc.
- 2021-10-05: TEN MILE CROSSING OFFICE BUILDING 6, Meridian: IDR10C01P, held by Engineered Structures, Inc.
- 2021-10-05: GREENACRES PLANT FOOD CENTER, Post Falls: IDR10L00X, held by MJ Takisaki Inc
- 2021-10-06: POIEMA SUB, Meridian: IDR10C01Q, held by Zach Evans Construction
- 2021-10-06: TWENTY MILE SOUTH COMPOST FACILITY, Boise: IDR10C01R, held by Knife River Corporation - Mountain West
IRON HORSE-SITE DEVELOPMENT among its neighbors
19 discharge permits are in the Texas Slough-Lower Henrys Fork subwatershed (HUC 170402030406); IDR10C01N is one.
Other permits in the Texas Slough-Lower Henrys Fork subwatershed (HUC 170402030406)
- 10 WARD LDS CHURCH, Rexburg: IDR10C0T7, minor, term to 2027-02-09
- 2020 CMPS PARKING LOT EXPANSION, Rexburg: IDR1002CX
- BEDROCK BUSINESS CENTER, Rexburg: IDR10C22E, minor, term to 2027-02-09
- BYUI TAYLOR PARKING LOT, Rexburg: IDR10L09E
- BYUI UNIVERSITY OPERATIONS SUPPORT SERVICES, Rexburg: IDR10C1VV, minor, term to 2027-02-09
- CHIPOTLE MEXICAN GRILL, Rexburg: IDR10L0CV
- EDSTROM CONSTRUCTION EAST PIT, Thornton: IDR10C0HL, minor, term to 2027-02-09
- EDSTROM CONSTRUCTION WEST PIT, Thornton: IDR10C0G5, minor, term to 2027-02-09
- JACOBSEN WASATCH GROUP, Rexburg: IDR10AU18
- JUNIPER COMMONS, Rexburg: IDR10C22T, minor, term to 2027-02-09
What stands out
- Its term runs 134 days, October 5, 2021 to February 16, 2022; the term ended 1,701 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | IRON HORSE-SITE DEVELOPMENT |
|---|---|
| Permittee | Depatco |
| NPDES ID | IDR10C01N |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 5, 2021 |
| Expires | February 16, 2022 |
| Address | Rexburg, ID 83440 |
| Receiving water | Texas Slough |
| Subwatershed | Texas Slough-Lower Henrys Fork (HUC 170402030406) |
NPDES IDR10C01N: effluent limits and exceedances
IRON HORSE-SITE DEVELOPMENT (NPDES IDR10C01N): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C01N: no pollutant row on file.
NPDES IDR10C01N: inspections, violations and enforcement
NPDES IDR10C01N (IRON HORSE-SITE DEVELOPMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C01N
NPDES IDR10C01N: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C01N
NPDES IDR10C01N: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.