NPDES IDR10C05N · Clean Water Act
RIVERCREEK LANDING SUBDIVISION NO. 1, Star, ID: NPDES IDR10C05N discharge permit, effluent exceedances, inspections, penalties
RIVERCREEK LANDING SUBDIVISION NO. 1, Star, Idaho: General permit coverage IDR10C05N, held by Kine Development; Construction stormwater; Administratively continued; issued December 20, 2021, term to February 16, 2022; discharges to Unnamed Irrigation Drainage, Little Gulch Creek.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 554 were issued before IDR10C05N. Kine Development holds 3 permits in Idaho.
Other permits held by Kine Development
- AMERICAN STAR SUBDIVISION NO. 2, Star: IDR1002TO, issued 2020-11-27
- AMERICAN STAR SUBDIVISION NO. 3, Star: IDR10C05M, issued 2021-12-20
Coverages issued nearest IDR10C05N
- 2021-12-17: EAGLE RIDGE SUBDIVISION PHASE 1, Eagle: IDR10C05H, held by Lennar Homes, LLC
- 2021-12-17: BREEZY COMMONS TOWNHOUSES, Pocatello: IDR10C05I, held by Gate City Builders
- 2021-12-20: N. 21ST AVE. PARKING 2021, Caldwell: IDR10C05K, held by Central Cove Construction, LLC
- 2021-12-20: ELEMENT SKYE SUBDIVISION, Eagle: IDR10C05L, held by Element Design Build
- 2021-12-20: AMERICAN STAR SUBDIVISION NO. 3, Star: IDR10C05M, held by Kine Development
- 2021-12-20: MIDDLETON RD. AND ORCHARD AVE. INTERSECTION SIGNALIZATION, Nampa: IDR10L01M, held by Knife River Corporation - Mountain West
- 2021-12-21: DISCOVERY PARK PHASE 2, Meridian: IDR10C05O, held by City of Meridian
- 2021-12-21: TM FRONTLINE, Meridian: IDR10C05P, held by TM Frontline
- 2021-12-27: ENGINEERED STRUCTURES, INC., Meridian: IDR10C05R, held by Engineered Structures, Inc.
- 2021-12-27: HERON RIDGE NO. 3, Nampa: IDR10C05S, held by Schultz Development, LLC
RIVERCREEK LANDING SUBDIVISION NO. 1 among its neighbors
197 discharge permits are in the Mill Slough-Boise River subwatershed (HUC 170501140410); IDR10C05N is one. Its county: 668, 5 major; IDR10C05N is minor permit.
Other permits in the Mill Slough-Boise River subwatershed (HUC 170501140410)
- 1ST STREET TOWNHOMES SUBDIVISION, Star: IDR10C20H, minor, term to 2027-02-09
- 2684 BEACON LIGHT IMPROVEMENT PROJECT, Eagle: IDR10C1O0, minor, term to 2027-02-09
- 9335 SH-44 4 ACRE LOT, Middleton: IDR1002ZU
- ACHD LINDRE: SH44 TO FLOATING FEATHER, Eagle: IDR10C1TT, minor, term to 2027-02-09
- AMBERLY RANCH SUBDIVISION, Eagle: IDR10L0FX
- AMERICAN STAR SUBDIVISION NO. 2, Star: IDR1002TO, minor, term to 2022-02-15
- AMERICAN STAR SUBDIVISION NO. 3, Star: IDR10C05M, minor, term to 2022-02-16
- ARTESIAN SPRINGS SUBDIVISION, Middleton: IDR10C1JY, minor, term to 2027-02-09
- ARVORY CREST SUBDIVISION PHASE 4, Star: IDR10C1YC, minor, term to 2027-02-09
- BALD EAGLE POINTE SUBDIVISION NO. 1, Eagle: IDR1002PH, minor, term to 2022-02-15
What stands out
- Its term runs 58 days, December 20, 2021 to February 16, 2022; the term ended 1,672 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | RIVERCREEK LANDING SUBDIVISION NO. 1 |
|---|---|
| Permittee | Kine Development |
| NPDES ID | IDR10C05N |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 20, 2021 |
| Expires | February 16, 2022 |
| Address | Star, ID 83669 |
| Receiving water | Unnamed Irrigation Drainage, Little Gulch Creek |
| Subwatershed | Mill Slough-Boise River (HUC 170501140410) |
NPDES IDR10C05N: effluent limits and exceedances
RIVERCREEK LANDING SUBDIVISION NO. 1 (NPDES IDR10C05N): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C05N: no pollutant row on file.
NPDES IDR10C05N: inspections, violations and enforcement
NPDES IDR10C05N (RIVERCREEK LANDING SUBDIVISION NO. 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C05N
NPDES IDR10C05N: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C05N
NPDES IDR10C05N: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.