Clean Water Act discharge permit · NPDES IDR10C0RT
POWERLINE SUBDIVISION (SKYLINE), Nampa, ID: NPDES IDR10C0RT discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 1Inspections on file
- 0Formal enforcement actions
POWERLINE SUBDIVISION (SKYLINE), held by Powerline Subdivision (Skyline), holds NPDES permit IDR10C0RT, which discharges to Indian Creek. EPA’s file records it issued May 30, 2023 and expiring February 9, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What stands out
- Its term runs 3 years and 255 days, May 30, 2023 to February 9, 2027.
- Its newest dated event on file is an inspection on March 18, 2026, 181 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | POWERLINE SUBDIVISION (SKYLINE) |
|---|---|
| Permittee as filed | Powerline Subdivision (Skyline) |
| NPDES ID | IDR10C0RT |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | May 30, 2023 |
| Expiration date | February 9, 2027 |
| Address | Nampa, ID 83686 |
| Receiving water | Indian Creek |
| Subwatershed | Lower Indian Creek (HUC 170501140507) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C0RT.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C0RT.
Inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| March 18, 2026 | Evaluation | S |
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10C0RT.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C0RT.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10C0RT there.
POWERLINE SUBDIVISION (SKYLINE), Nampa, Idaho: Coverage under a general permit IDR10C0RT, held by Powerline Subdivision (Skyline); Construction stormwater; Effective; issued May 30, 2023, term to February 9, 2027; discharges to Indian Creek.
- March 18, 2026: Evaluation (S).
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 2,038 were issued before IDR10C0RT.
Coverages issued nearest IDR10C0RT
- 2023-05-23: MCARTHUR LAKE, Naples: IDR10C0RK, held by Damon Allen
- 2023-05-23: JUG MTN RANCH SUBDIVISION, PHASE 3B, Mccall: IDR10C0RL, held by Tyler Woodhouse
- 2023-05-23: 22956 23927 BUHL SCHOOL PEDESTRIAN FACILITIES & PATHWAY PH2, Buhl: IDR10L08N, held by Local Highway Technical Assistance Council
- 2023-05-25: NEW OFFICE WAREHOUSE FOR TRAX ELECTRIC, Boise: IDR10L08O, held by Hall Holdings
- 2023-05-30: HARTMAN RESIDENCE, Sun Valley: IDR10C0RN, held by Hall Brown, LLC
- 2023-05-30: LOCHLYN ESTATES, Careywood: IDR10C0RU, held by shaun mort
- 2023-05-30: NORTHWEST FOURSLIDE, Lewiston: IDR10C0RW, held by Kenaston Corporation
- 2023-05-30: TIMBER CREEK RESERVE SUBDIVISION #1, Donnelly: IDR10C0RX, held by Northlake-Durham LLC
- 2023-05-30: EDINGTON ESTATES, Moscow: IDR10C0RZ, held by Germer Construction
- 2023-05-30: LEGACY PARK DIVISION 1, Chubbuck: IDR10C0S0, held by Jason Holm
POWERLINE SUBDIVISION (SKYLINE) among its neighbors
358 discharge permits are in the Lower Indian Creek subwatershed (HUC 170501140507); IDR10C0RT is one. Its county: 377, 2 major; IDR10C0RT is minor permit.
Other permits in the Lower Indian Creek subwatershed (HUC 170501140507)
- 11TH AVE S 2-WAY CONVERSION CITY OF NAMPA, Nampa: IDR10L0LN
- 11TH AVE S TWO-WAY CONVERSION, Nampa: IDR10L0LO
- 12TH-15TH 2ND-7TH ST. SOUTH WATERLINES REPLACEMENT, Nampa: IDR10C27N, minor, term to 2027-02-09
- 1908 SUNNY RIDGE, Nampa: IDR1001JD
- 1ST ST. & ROOSEVELT AVE. WATERLINE, Nampa: IDR1000GJ
- 2025 ARTERIAL & COLLECTOR CAPITAL MAINTENANCE, Kuna: IDR10C1UW, minor, term to 2027-02-09
- 203 AND 212 1ST AVE., Nampa: IDR10L0J9
- 21ST AVENUE MARRIOTT, Caldwell: IDR10C1IN, minor, term to 2027-02-09
- 24229 MIDDLETON RD, SH 55 TO FLAMINGO AVE, Nampa: IDR10L0LR
- 6TH STREET MULTI-PLEXES, Nampa: IDR1001D8
Nearby on the register
- Discharge permits in Nampa
- Every permit record in Nampa, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
Among the 308 storm water construction permits in Canyon County, 0.0% carry a violation on file, and POWERLINE SUBDIVISION (SKYLINE) is counted in that total. Lower Indian Creek lists 358 NPDES permits, while 98.1% of the 269 storm water construction permits in Canyon County, counting this permit, were issued before it.