Clean Water Act discharge permit · NPDES IDR10C125
DRY CREEK RANCH VILLAGE PHASE 3 (BROOKSIDE DEVELOPERS), Boise, ID: NPDES IDR10C125 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
DRY CREEK RANCH VILLAGE PHASE 3 (BROOKSIDE DEVELOPERS), held by Brookside Developers, Inc., holds NPDES permit IDR10C125, which discharges to Dry Creek. EPA’s file records it issued January 10, 2022 and expiring February 9, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for DRY CREEK RANCH VILLAGE PHASE 3 (BROOKSIDE DEVELOPERS): its NPDES ID, its permit type and status, its dates, its address in Boise, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C125.
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | DRY CREEK RANCH VILLAGE PHASE 3 (BROOKSIDE DEVELOPERS) |
|---|---|
| Permittee as filed | Brookside Developers, Inc. |
| NPDES ID | IDR10C125 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expiration date | February 9, 2027 |
| Address | Boise, ID 83714 |
| Receiving water | Dry Creek |
| Subwatershed | Currant Creek-Dry Creek (HUC 170501140103) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C125.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C125.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10C125.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10C125.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C125.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10C125 there.
DRY CREEK RANCH VILLAGE PHASE 3 (BROOKSIDE DEVELOPERS), Boise, Idaho: Coverage under a general permit IDR10C125, held by Brookside Developers, Inc.; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Dry Creek.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C125. Brookside Developers, Inc. holds 13 permits in Idaho.
Other permits held by Brookside Developers, Inc.
- DRY CREEK SUBDIVISION NO. 3-6, Boise: IDR1001GM, issued 2018-11-05
- DRY CREEK PHASE 5, Boise: IDR1002HC, issued 2020-05-12
- DRY CREEK RANCH VILLAGE SUBDIVISION NO 1, Boise: IDR1002OM, issued 2020-09-15
- DRY CREEK RANCH SUBDIVISION NO. 7, Eagle: IDR10033V, issued 2021-04-28
- DRY CREEK RANCH SUBDIVISION PHASE #9, Boise: IDR10C11H, issued 2022-01-10
- DRY CREEK VILLAGE - PHASE 4, Boise: IDR10C1BZ, issued 2022-01-10
- DRY CREEK VILLAGE - PHASE 4 DUMP SITE, Boise: IDR10C1CG, issued 2022-01-10
- DRY CREEK RANCH VILLAGE SUBDIVISION NO. 1 & 2, Boise: IDR10C1HU, issued 2022-01-10
- DRY CREEK RANCH SUBDIVISION NO. 10, Boise: IDR10C1JL, issued 2022-01-10
- DRY CREEK RANCH SUBDIVISION #9, Boise: IDR10C1ZO, issued 2022-01-10
Coverages issued nearest IDR10C125
- 2022-01-10: PRESCOTT RIDGE SUBDIVISION NO 2, Meridian: IDR10C11X, held by Hubble Homes, LLC
- 2022-01-10: HYGGE AT HARRIS RANCH, Boise: IDR10C11Y, held by ID Elemental
- 2022-01-10: LONG HORN ACRES SUBDIVISION SITE IMPROVEMENTS, Emmett: IDR10C120, held by CM Company
- 2022-01-10: COLT HEIGHTS SUBDIVISION, City Of Star: IDR10C122, held by Trilogy Development, Inc.
- 2022-01-10: MAGNOLIA ESTATES SUBDIVISION, Nampa: IDR10C123, held by Trilogy Developments, Inc
- 2022-01-10: FY24 ARTERIAL & COLLECTOR CAPITAL MAINTENANCE, Kuna: IDR10C126, held by Capital Paving Company Inc.
- 2022-01-10: ITD D3 23336, Nampa: IDR10C12B, held by Idaho Transportation Dept D3
- 2022-01-10: STAR RIVER RANCH NORTH SUBDIVISION NO 1, City Of Star: IDR10C12C, held by DB Development, LLC
- 2022-01-10: I-84 CENTENNIAL IC TO FRANKLIN IC, CANYON CO., Caldwell: IDR10C12D, held by Idaho Transportation Department
- 2022-01-10: WHITE PINES APARTMENT HOMES PH. 2, Nampa: IDR10C12F, held by Pedcor Construction Management, LLC
DRY CREEK RANCH VILLAGE PHASE 3 (BROOKSIDE DEVELOPERS) among its neighbors
32 discharge permits are in the Currant Creek-Dry Creek subwatershed (HUC 170501140103); IDR10C125 is one. Its county: 668, 5 major; IDR10C125 is minor permit.
Other permits in the Currant Creek-Dry Creek subwatershed (HUC 170501140103)
- ADA COUNTY LANDFILL TOPSOIL STRIPPING PROJECT 2025, Boise: IDR10C1Q1, minor, term to 2027-02-09
- BRIGHTON DEVELOPMENT INC - NEVILLE RANCH #1 - CARTWRIGHT RANCH, Boise: IDR12G241
- BROKEN HORN, Boise: IDR10C1JI, minor, term to 2027-02-09
- CARTWRIGHT BUILDING B, Garden City: IDR10031C
- CARTWRIGHT RANCH, Boise: IDR1000RZ, minor, term to 2022-02-15
- CARTWRIGHT RETAIL BUILDING, Garden City: IDR10031D
- CIMARRON SPRINGS LOT 1 BLOCK 1, Boise: IDR10C0IZ, minor, term to 2027-02-09
- DANIELS CREEK, Boise: IDR10C13M, minor, term to 2027-02-09
- DRY CREEK PHASE 5, Boise: IDR1002HC, minor, term to 2022-02-15
- DRY CREEK RANCH PHASE 11, Boise: IDR10C21J, minor, term to 2027-02-09
Nearby on the register
- Discharge permits in Boise
- Every permit record in Boise, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
DRY CREEK RANCH VILLAGE PHASE 3 (BROOKSIDE DEVELOPERS) is among the 561 storm water construction permits in Ada County, and 0.0% of those carry a violation on file. The Currant Creek-Dry Creek subwatershed contains 32 NPDES permits, this one included. Of the 451 storm water construction permits in Ada County, 8.4% were issued before this permit.