Velarion Records
Free: one email when NPDES IDR10C1FC changes. Unsubscribe any time.

NPDES IDR10C1FC · Clean Water Act

LIFE TIME, Eagle, ID: NPDES IDR10C1FC discharge permit, effluent exceedances, inspections, penalties

LIFE TIME, Eagle, Idaho: General permit coverage IDR10C1FC, held by Power Construction; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to North Channel Boise River.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1FC. Power Construction holds 2 permits in Idaho.

Other permits held by Power Construction

Coverages issued nearest IDR10C1FC

LIFE TIME among its neighbors

223 discharge permits are in the North Slough-Boise River subwatershed (HUC 170501140404); IDR10C1FC is one.

Other permits in the North Slough-Boise River subwatershed (HUC 170501140404)

What stands out

  • Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityLIFE TIME
PermitteePower Construction
NPDES IDIDR10C1FC
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJanuary 10, 2022
ExpiresFebruary 9, 2027
AddressEagle, ID 83616
Receiving waterNorth Channel Boise River
Receiving water impaired303(D) Listed
SubwatershedNorth Slough-Boise River (HUC 170501140404)

NPDES IDR10C1FC: effluent limits and exceedances

LIFE TIME (NPDES IDR10C1FC): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10C1FC: no pollutant row on file.

NPDES IDR10C1FC: inspections, violations and enforcement

NPDES IDR10C1FC (LIFE TIME): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10C1FC

NPDES IDR10C1FC: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10C1FC

NPDES IDR10C1FC: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.