NPDES IDR10C1GM · Clean Water Act

D&B SUPPLY, Jerome, ID: NPDES IDR10C1GM discharge permit, effluent exceedances, inspections, penalties

D&B SUPPLY, Jerome, Idaho: General permit coverage IDR10C1GM, held by 5J Excavation; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to 2nd order segment of Briggs Creek and Cedar Draw; Commercial and Institutional Building Construction.

  • February 9, 2026: No Further Action (State).
  • August 1, 2025: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • August 1, 2025: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • August 1, 2025: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
  • May 27, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • May 20, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • May 13, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • April 30, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • April 23, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • April 9, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • April 2, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • March 20, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • March 13, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • March 6, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • February 27, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • February 20, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • February 13, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • February 6, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • January 30, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1GM. 5J Excavation holds 2 permits in Idaho.

Other permits held by 5J Excavation

Coverages issued nearest IDR10C1GM

D&B SUPPLY among its neighbors

13 discharge permits are in the Sucker Flat-Snake River subwatershed (HUC 170402120704); IDR10C1GM is one.

Other permits in the Sucker Flat-Snake River subwatershed (HUC 170402120704)

What stands out

  • Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
  • Its newest dated event on file is an informal enforcement action on February 9, 2026, 247 days before EPA's file was loaded.
  • In the 365 days to October 14, 2026, it was dated 1 informal enforcement action.
  • EPA's file dates 19 events for it, from 2025 to 2026; the busiest year is 2025 with 18.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityD&B SUPPLY
Permittee5J Excavation
NPDES IDIDR10C1GM
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJanuary 10, 2022
ExpiresFebruary 9, 2027
AddressJerome, ID 83338
Receiving water2nd order segment of Briggs Creek and Cedar Draw
SubwatershedSucker Flat-Snake River (HUC 170402120704)
NAICS236220 – Commercial and Institutional Building Construction
SIC1542 – Nonresidential Construction

NPDES IDR10C1GM: effluent limits and exceedances

D&B SUPPLY (NPDES IDR10C1GM): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10C1GM: no pollutant row on file.

NPDES IDR10C1GM: inspections, violations and enforcement

NPDES IDR10C1GM: 18 single-event violations

DateWhat EPA recordedAgency
August 1, 2025WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMPST6
August 1, 2025WW Storm Water Construction - Failure to properly install/implement BMPsST6
August 1, 2025WW Storm Water Construction - Failure to properly operate and maintain BMPsST6
May 27, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
May 20, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
May 13, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
April 30, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
April 23, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
April 9, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
April 2, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
March 20, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
March 13, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
March 6, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
February 27, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
February 20, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
February 13, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
February 6, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
January 30, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6

NPDES IDR10C1GM: 1 informal enforcement action

DateWhat EPA recordedAgency
February 9, 2026No Further ActionState

NPDES IDR10C1GM (D&B SUPPLY): no inspection and formal enforcement action on file.

Watch NPDES IDR10C1GM

NPDES IDR10C1GM: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10C1GM

NPDES IDR10C1GM: 0 pollutant rows, 19 dated events; ICIS-NPDES download, loaded October 14, 2026.