WOODBURY SUBDIVISION ADDITION 1, Moscow, ID: NPDES IDR10C1H1 discharge permit, effluent exceedances, inspections, penalties

WOODBURY SUBDIVISION ADDITION 1, Moscow, Idaho: General permit coverage IDR10C1H1, held by Levi Wintz; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Paradise Creek.

  • June 9, 2026: State CWA Penalty AO (State), $10,775 state or local penalty.
  • February 24, 2025: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • February 24, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • February 24, 2025: WW Storm Water Construction - Failure to Maintain Records (ST6).
  • February 24, 2025: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • February 24, 2025: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
  • February 24, 2025: WW Storm Water Construction - Discharge without a permit (ST6).

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1H1.

Coverages issued nearest IDR10C1H1

WOODBURY SUBDIVISION ADDITION 1 among its neighbors

40 discharge permits are in the Paradise Creek subwatershed (HUC 170601080202); IDR10C1H1 is one.

Other permits in the Paradise Creek subwatershed (HUC 170601080202)

What stands out

  • Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
  • Its newest dated event on file is a formal enforcement action on June 9, 2026, 98 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 formal enforcement action.
  • EPA's file dates 7 events for it, from 2025 to 2026; the busiest year is 2025 with 6.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityWOODBURY SUBDIVISION ADDITION 1
PermitteeLevi Wintz
NPDES IDIDR10C1H1
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJanuary 10, 2022
ExpiresFebruary 9, 2027
AddressMoscow, ID 83843
Receiving waterParadise Creek
SubwatershedParadise Creek (HUC 170601080202)

NPDES IDR10C1H1: effluent limits and exceedances

WOODBURY SUBDIVISION ADDITION 1 (NPDES IDR10C1H1): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10C1H1: no pollutant row on file.

NPDES IDR10C1H1: inspections, violations and enforcement

NPDES IDR10C1H1: 6 single-event violations

DateWhat EPA recordedAgency
February 24, 2025WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMPST6
February 24, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6
February 24, 2025WW Storm Water Construction - Failure to Maintain RecordsST6
February 24, 2025WW Storm Water Construction - Failure to properly install/implement BMPsST6
February 24, 2025WW Storm Water Construction - Failure to properly operate and maintain BMPsST6
February 24, 2025WW Storm Water Construction - Discharge without a permitST6

NPDES IDR10C1H1: 1 formal enforcement action

1 of them with a penalty assessed. How penalties are shown.

DateWhat EPA recordedAgencyFederal penaltyState or local penalty
June 9, 2026State CWA Penalty AOState$10,775

NPDES IDR10C1H1 (WOODBURY SUBDIVISION ADDITION 1): no inspection and informal enforcement action on file.

Watch NPDES IDR10C1H1

NPDES IDR10C1H1: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10C1H1

NPDES IDR10C1H1: 0 pollutant rows, 7 dated events; ICIS-NPDES download, loaded September 15, 2026.