NPDES IDR10C1HN · Clean Water Act
PROJECT BULLDOG WID8, Sandpoint, ID: NPDES IDR10C1HN discharge permit, effluent exceedances, inspections, penalties
PROJECT BULLDOG WID8, Sandpoint, Idaho: General permit coverage IDR10C1HN, held by CSI Construction; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Sand Creek.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1HN.
Coverages issued nearest IDR10C1HN
- 2022-01-10: CASPIAN SUBDIVISION NO 3, Meridian: IDR10C1HI, held by DB Development
- 2022-01-10: SPRINGHILL SUBDIVISION NO 5, Meridian: IDR10C1HJ, held by DB Development
- 2022-01-10: MADRONE HEIGHTS SUBDIVISION NO 4, Kuna: IDR10C1HK, held by DB Development
- 2022-01-10: WHISPER MEADOWS SUBDIVISION NO 2, Meridian: IDR10C1HL, held by DB Development
- 2022-01-10: GANDER CREEK NORTH SUBDIVISION NO. 3, Meridian: IDR10C1HM, held by Trilogy Development, Inc.
- 2022-01-10: GE CONSTRUCTION, LLC CONTRACTORS YARD & SHOP, Kuna: IDR10C1HP, held by Gabbert & Edwards Construction, LLC
- 2022-01-10: RESIDENCES AT WILSON CREEK, Caldwell: IDR10C1HQ, held by Layton Construction
- 2022-01-10: ITD D3 23956 SH16 SYSTEM IC AND FRANKLIN RD IC, Nampa: IDR10C1HR, held by Idaho Transportation Dept D3
- 2022-01-10: HANKINS PUMP STATION #2, Twin Falls: IDR10C1HS, held by IMCO General Construction
- 2022-01-10: APEX ZENITH UTILITIES, Meridian: IDR10C1HT, held by Smith Brighton, Inc.
PROJECT BULLDOG WID8 among its neighbors
36 discharge permits are in the Sand Creek subwatershed (HUC 170102140205); IDR10C1HN is one.
Other permits in the Sand Creek subwatershed (HUC 170102140205)
- AIRPORT, Sandpoint: IDR10C1SZ, minor, term to 2027-02-09
- BASE CAMP, Sandpoint: IDR10C105, minor, term to 2027-02-09
- BIG SKY DEVELOPMENT - SPIRES PUD 2ND ADDITION, Sandpoint: IDR10CO38
- BIG SKY DEVELOPMENT - THE SPIRES PUD 1ST ADDITION, Sandpoint: IDR10CF85
- BOYER COMMERS PARK, Sandpoint: IDR10C20C, minor, term to 2027-02-09
- BOYER FARM ESTATES, Sandpoint: IDR10C0KY, minor, term to 2027-02-09
- BOYER HANGERS, Sandpoint: IDR10L0LG
- BRONX ROAD SUBSTATION, Sandpoint: IDR10C24E, minor, term to 2027-02-09
- CEDARS AT SANDCREEK, Sandpoint: IDR10BK79
- CEDARS BLOCK 2, Sandpoint: IDR10L00F, term to 2021-10-06
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PROJECT BULLDOG WID8 |
|---|---|
| Permittee | CSI Construction |
| NPDES ID | IDR10C1HN |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Sandpoint, ID 83864 |
| Receiving water | Sand Creek |
| Subwatershed | Sand Creek (HUC 170102140205) |
NPDES IDR10C1HN: effluent limits and exceedances
PROJECT BULLDOG WID8 (NPDES IDR10C1HN): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C1HN: no pollutant row on file.
NPDES IDR10C1HN: inspections, violations and enforcement
NPDES IDR10C1HN (PROJECT BULLDOG WID8): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C1HN
NPDES IDR10C1HN: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C1HN
NPDES IDR10C1HN: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.