NPDES IDR10C1II · Clean Water Act
JOPLIN RIM SUBDIVISION, Meridian, ID: NPDES IDR10C1II discharge permit, effluent exceedances, inspections, penalties
JOPLIN RIM SUBDIVISION, Meridian, Idaho: General permit coverage IDR10C1II, held by Lennar Homes of Idaho, LLC; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Boise River.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1II. Lennar Homes of Idaho, LLC holds 13 permits in Idaho.
Other permits held by Lennar Homes of Idaho, LLC
- CIRRUS POINTE SUBDIVISION NO. 9, Caldwell: IDR10C15M, issued 2022-01-10
- SOTERRA SUBDIVISION - PHASE 1 (LENNAR), Caldwell: IDR10C1IH, issued 2022-01-10
- BENTLEY MEADOWS SUBDIVISION, Nampa: IDR10C1OE, issued 2022-01-10
- EWING MEADOWS SUBDIVISION NO. 2 & 3, Meridian: IDR10C1Q5, issued 2022-01-10
- BARATZA SUBDIVISION PHASE 1 & LEMP CANAL REALIGNMENT, Meridian: IDR10C1Q6, issued 2022-01-10
- JAYHAWK CREEK SUBDIVISION (LENNAR), Caldwell: IDR10C1TJ, issued 2022-01-10
- BARATZA SUBDIVISION PHASE 2 & MASS GRADING, Meridian: IDR10C1V1, issued 2022-01-10
- EAST RANCH SUBDIVISION NO. 1 & MASS GRADING, Nampa: IDR10C1WZ, issued 2022-01-10
- ELEMENT RIDGE SUBDIVISION NO. 1, Caldwell: IDR10C1XB, issued 2022-01-10
- ELEMENT RIDGE SUBDIVISION NO. 2, Caldwell: IDR10C1XC, issued 2022-01-10
Coverages issued nearest IDR10C1II
- 2022-01-10: AMERICAN FALLS EROSION PHASE 1-4, American Falls: IDR10C1IB, held by Bureau of Reclamation
- 2022-01-10: CAN ADA LIFT STATION & GRAVITY LINE, Meridian: IDR10C1ID, held by Das-Co of Idaho a Whitaker Company
- 2022-01-10: BOISE PETERBILT, Boise: IDR10C1IE, held by Compliance Solutions & Contracting
- 2022-01-10: RIVERTON SUBDIVISION NO 1, Kuna: IDR10C1IF, held by Hubble Homes, LLC
- 2022-01-10: SOTERRA SUBDIVISION - PHASE 1 (LENNAR), Caldwell: IDR10C1IH, held by Lennar Homes of Idaho, LLC
- 2022-01-10: MOSCOW CITY SHOPS, Moscow: IDR10C1IJ, held by Wellens General Contractors
- 2022-01-10: TALEGA VILLAGE, Eagle: IDR10C1IK, held by Ramsey Construction LLC
- 2022-01-10: TSC DISTRIBUTION FACILITY #846, Nampa: IDR10C1IL, held by H&M Construction Co., Inc.
- 2022-01-10: WHITEROCK SUBDIVSION, Null: IDR10C1IM, held by Linder Land LLC
- 2022-01-10: 21ST AVENUE MARRIOTT, Caldwell: IDR10C1IN, held by Faber Construction
JOPLIN RIM SUBDIVISION among its neighbors
141 discharge permits are in the South Slough-Boise River subwatershed (HUC 170501140405); IDR10C1II is one.
Other permits in the South Slough-Boise River subwatershed (HUC 170501140405)
- 2ND SPACE STORAGE, Meridian: IDR10C1G9, minor, term to 2027-02-09
- 4120 N. LINDER RD. COMMERCIAL, Meridian: IDR10035O, minor, term to 2022-02-15
- 55 RESORT AT VERANO PLACE, Meridian: IDR10C06V, minor, term to 2022-02-16
- ACHD CT226-07: LIBERTY ST: DOUGLAS ST. TO DENTON ST., Boise: IDR10C1VT, minor, term to 2027-02-09
- ADDISON CIRCLE SUBDIVSION, Meridian: IDR10C1R9, minor, term to 2027-02-09
- ADERO PARK SUBDIVISION NO 2, Meridian: IDR10C1UM, minor, term to 2027-02-09
- ADERO PARK SUBDIVISION NO 2, Meridian: IDR10C1UN, minor, term to 2027-02-09
- ALICIA COURT SUBDIVISION, Meridian: IDR10024C
- ALPINE ST, ORCHARD ST TO RANDALL ST, Boise: IDR100071
- AMBLESIDE SUBDIVISION NO 1, Boise: IDR100376
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | JOPLIN RIM SUBDIVISION |
|---|---|
| Permittee | Lennar Homes of Idaho, LLC |
| NPDES ID | IDR10C1II |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Meridian, ID 83646 |
| Receiving water | Boise River |
| Subwatershed | South Slough-Boise River (HUC 170501140405) |
NPDES IDR10C1II: effluent limits and exceedances
JOPLIN RIM SUBDIVISION (NPDES IDR10C1II): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C1II: no pollutant row on file.
NPDES IDR10C1II: inspections, violations and enforcement
NPDES IDR10C1II (JOPLIN RIM SUBDIVISION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C1II
NPDES IDR10C1II: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C1II
NPDES IDR10C1II: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.