NPDES IDR10C1PC · Clean Water Act
NAMPA HATCHERY RECONSTRUCTION, Nampa, ID: NPDES IDR10C1PC discharge permit, effluent exceedances, inspections, penalties
NAMPA HATCHERY RECONSTRUCTION, Nampa, Idaho: General permit coverage IDR10C1PC, held by JC Constructors, Inc.; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Wilson Drain.
- September 3, 2026: Management Practice Violations - Improper Operation and Maintenance (ST6).
- September 3, 2026: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- September 3, 2026: WW Storm Water Construction - Discharge without a permit (ST6).
- September 3, 2026: Evaluation (S).
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1PC. JC Constructors, Inc. holds 2 permits in Idaho.
Other permits held by JC Constructors, Inc.
- WASTEWATER TREATMENT PLANT UPGRADE FY22, Middleton: IDR10C27T, issued 2022-01-10
Coverages issued nearest IDR10C1PC
- 2022-01-10: HARMSEN A DRAIN, Caldwell: IDR10C1P4, held by Joseph Jeffs
- 2022-01-10: RIGBY FIELDHOUSE, Rigby: IDR10C1P6, held by Headwaters Construction
- 2022-01-10: BRUNDAGE MTN ORIGINS PHASE 1B, Mccall: IDR10C1P9, held by MTN Origins Construction
- 2022-01-10: FAIRWAY ESTATES DIVISION 26, Idaho Falls: IDR10C1PA, held by H-K Contractors, Inc
- 2022-01-10: TRAPPERS ISLAND, Boise: IDR10C1PB, held by Jayo Construction
- 2022-01-10: CASE RESIDENCE, Hailey: IDR10C1PE, held by Lee Gilman Builders
- 2022-01-10: SHETLAND POINT SUBDIVISION, Eagle: IDR10C1PF, held by Sterling Homes, LLC
- 2022-01-10: TRIUMPH MINE SITE, Triumph: IDR10C1PH, held by Dahle Construction, LLC
- 2022-01-10: SUSIE Q RANCH, Carey: IDR10C1PI, held by RIVHAB Engineering Design
- 2022-01-10: HORSESHOE BEND STORAGE CONDOS, Eagle: IDR10C1PK, held by LZL Ventures, LLC
NAMPA HATCHERY RECONSTRUCTION among its neighbors
358 discharge permits are in the Lower Indian Creek subwatershed (HUC 170501140507); IDR10C1PC is one. Its county: 377, 2 major; IDR10C1PC is minor permit.
Other permits in the Lower Indian Creek subwatershed (HUC 170501140507)
- 11TH AVE S 2-WAY CONVERSION CITY OF NAMPA, Nampa: IDR10L0LN
- 11TH AVE S TWO-WAY CONVERSION, Nampa: IDR10L0LO
- 12TH-15TH 2ND-7TH ST. SOUTH WATERLINES REPLACEMENT, Nampa: IDR10C27N, minor, term to 2027-02-09
- 1908 SUNNY RIDGE, Nampa: IDR1001JD
- 1ST ST. & ROOSEVELT AVE. WATERLINE, Nampa: IDR1000GJ
- 2025 ARTERIAL & COLLECTOR CAPITAL MAINTENANCE, Kuna: IDR10C1UW, minor, term to 2027-02-09
- 203 AND 212 1ST AVE., Nampa: IDR10L0J9
- 21ST AVENUE MARRIOTT, Caldwell: IDR10C1IN, minor, term to 2027-02-09
- 24229 MIDDLETON RD, SH 55 TO FLAMINGO AVE, Nampa: IDR10L0LR
- 6TH STREET MULTI-PLEXES, Nampa: IDR1001D8
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- Its newest dated event on file is single-event violation and inspection on September 3, 2026, 12 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 3 single-event violations, 1 inspection.
- EPA's file dates 4 events for it, all in 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NAMPA HATCHERY RECONSTRUCTION |
|---|---|
| Permittee | JC Constructors, Inc. |
| NPDES ID | IDR10C1PC |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Nampa, ID 83686 |
| Receiving water | Wilson Drain |
| Subwatershed | Lower Indian Creek (HUC 170501140507) |
| Other EPA IDs (FRS) | RCRA handler IDR000003723 |
NPDES IDR10C1PC: effluent limits and exceedances
NAMPA HATCHERY RECONSTRUCTION (NPDES IDR10C1PC): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C1PC: no pollutant row on file.
NPDES IDR10C1PC: inspections, violations and enforcement
NPDES IDR10C1PC: 3 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| September 3, 2026 | Management Practice Violations - Improper Operation and Maintenance | ST6 |
| September 3, 2026 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| September 3, 2026 | WW Storm Water Construction - Discharge without a permit | ST6 |
NPDES IDR10C1PC: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| September 3, 2026 | Evaluation | S |
NPDES IDR10C1PC (NAMPA HATCHERY RECONSTRUCTION): no formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C1PC
NPDES IDR10C1PC: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C1PC
NPDES IDR10C1PC: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded September 15, 2026.