Clean Water Act discharge permit · NPDES IDR10C1SF
CANYON ROAD BRIDGE 30590, Cataldo, ID: NPDES IDR10C1SF discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
CANYON ROAD BRIDGE 30590, held by Daniel Kuney, holds NPDES permit IDR10C1SF, which discharges to Coeur D'Alene River. EPA’s file records it issued January 10, 2022 and expiring February 9, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for CANYON ROAD BRIDGE 30590: its NPDES ID, its permit type and status, its dates, its address in Cataldo, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C1SF.
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | CANYON ROAD BRIDGE 30590 |
|---|---|
| Permittee as filed | Daniel Kuney |
| NPDES ID | IDR10C1SF |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expiration date | February 9, 2027 |
| Address | Cataldo, ID 83810 |
| Receiving water | Coeur d'Alene River |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Rose Creek-Coeur d'Alene River (HUC 170103030103) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C1SF.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C1SF.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10C1SF.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10C1SF.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C1SF.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10C1SF there.
CANYON ROAD BRIDGE 30590, Cataldo, Idaho: Coverage under a general permit IDR10C1SF, held by Daniel Kuney; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Coeur d'Alene River.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1SF.
Coverages issued nearest IDR10C1SF
- 2022-01-10: PINECREST TOWNHOMES, Chubbuck: IDR10C1S8, held by Keaton Campbell
- 2022-01-10: RIDENBAUGH CANAL DIVERSION, Boise: IDR10C1S9, held by RSCI
- 2022-01-10: NEW YORK LANDING SUBDIVISION NO. 5, Nampa: IDR10C1SB, held by Trilogy Development, Inc.
- 2022-01-10: FORT BOISE WILDLIFE MANAGEMENT AREA, Parma: IDR10C1SC, held by Tyler Archibald
- 2022-01-10: WILDER RANCH, Tetonia: IDR10C1SD, held by Milo Excavation and Equipment
- 2022-01-10: EAGLEDALE SUBDIVISION PHASE 3 & 4, Eagle: IDR10C1SG, held by TH Holdings 2022, LLC
- 2022-01-10: NUTRIEN AG SOLUTIONS, Buhl: IDR10C1SH, held by Greg Wolford
- 2022-01-10: PORT OF LEWISTON FIBER OPTIC PROJECT, Grangeville: IDR10C1SJ, held by Crown Utilities LLC
- 2022-01-10: CALLAWAY RANCH SEWER CONNECTION (AXSUS), Eagle: IDR10C1SK, held by Axsus Civil
- 2022-01-10: LOWER LEMHI ADAPTIVE MANAGEMENT AREA 3, Baker: IDR10C1SL, held by Boyd Foster Backhoe Service, Inc
CANYON ROAD BRIDGE 30590 among its neighbors
6 discharge permits are in the Rose Creek-Coeur d'Alene River subwatershed (HUC 170103030103); IDR10C1SF is one. Its county: 107, 3 major; IDR10C1SF is minor permit.
Other permits in the Rose Creek-Coeur d'Alene River subwatershed (HUC 170103030103)
- I90, CDA RV BR EBL & WBL, Cataldo: IDR10C183, minor, term to 2027-02-09
- ITD I-90 CDA RIVER BRIDGES PROJECT, Cataldo: IDR10C17Z, minor, term to 2027-02-09
- KINGSTON-CATALDO (OWNER) WASTEWATER TREATMENT SYSTEM IMPROVEMENTS, Kingston: IDR10C1KR, minor, term to 2027-02-09
- KINGSTON-CATALDO WASTEWATER TREATMENT SYSTEM IMPROVEMENTS, Kingston: IDR10C1K8, minor, term to 2027-02-09
- LILB 30590 CANYON ROAD BRIDGE, Cataldo: IDR10C1SI, minor, term to 2027-02-09
Nearby on the register
- Discharge permits in Cataldo
- Every permit record in Cataldo, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
Of the 78 storm water construction permits in Kootenai County, 0.0% carry a violation on file, and CANYON ROAD BRIDGE 30590 is among them. The Rose Creek-Coeur d'Alene River subwatershed holds 6 NPDES permits, this permit included. Among the 44 Kootenai County storm water construction permits that include this permit, 6.8% were issued earlier than this permit.