Clean Water Act discharge permit · NPDES IDR10C1WN
LEMHI RIVER MILE 32 ISLAND PHASE, Lemhi, ID: NPDES IDR10C1WN discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
LEMHI RIVER MILE 32 ISLAND PHASE, held by Boyd Foster Backhoe Service, Inc, holds NPDES permit IDR10C1WN, which discharges to Lemhi River. EPA’s file records it issued January 10, 2022 and expiring February 9, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for LEMHI RIVER MILE 32 ISLAND PHASE: its NPDES ID, its permit type and status, its dates, its address in Lemhi, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C1WN.
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | LEMHI RIVER MILE 32 ISLAND PHASE |
|---|---|
| Permittee as filed | Boyd Foster Backhoe Service, Inc |
| NPDES ID | IDR10C1WN |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expiration date | February 9, 2027 |
| Address | Lemhi, ID 83465 |
| Receiving water | Lemhi River |
| Subwatershed | Muddy Creek-Lemhi River (HUC 170602040702) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C1WN.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C1WN.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10C1WN.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10C1WN.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C1WN.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10C1WN there.
LEMHI RIVER MILE 32 ISLAND PHASE, Lemhi, Idaho: Coverage under a general permit IDR10C1WN, held by Boyd Foster Backhoe Service, Inc; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Lemhi River.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1WN. Boyd Foster Backhoe Service, Inc holds 7 permits in Idaho.
Other permits held by Boyd Foster Backhoe Service, Inc
- MONDELEZ - BOISE, Boise: IDNOEJ11A
- UPS-TWIN FALLS, Twin Falls: IDNOEJ11C
- LOWER LEMHI ADAPTIVE MANAGEMENT AREA 3, Baker: IDR10C1SL, issued 2022-01-10
- SUBREACH 4 COMPLETION STOKES, Baker: IDR10L0JS
- SUBREACH 4 COMPLETION STOKES 2, Baker: IDR10L0KA
- HAYDEN CREEK SCREW TRAP PROJECT, Lemhi: IDR10L0MY
Coverages issued nearest IDR10C1WN
- 2022-01-10: ASHTON ESTATES PHASE 8, Kuna: IDR10C1WI, held by Hayden Homes of Idaho
- 2022-01-10: CLEVELAND BLVD. FLEX BUILDING, Caldwell: IDR10C1WJ, held by Hyndman Construction, LLC
- 2022-01-10: HARTWELL GROVE SUBDIVISION, Boise: IDR10C1WK, held by Hayden Homes Idaho, LLC
- 2022-01-10: NORTHERN LIGHT CONDO DEVELOPMENT, Sandpoint: IDR10C1WL, held by Kevin Clyde
- 2022-01-10: CRIMSON ORCHARD SOLAR, Mountain Home: IDR10C1WM, held by BH Inc
- 2022-01-10: APEX ZENITH PHASE 1/PHASE 2, Meridian: IDR10C1WO, held by Smith Brighton Inc
- 2022-01-10: ARROYO VISTA SUBDIVISION NO 3, Kuna: IDR10C1WP, held by DB Development
- 2022-01-10: CENTERVILLE SUBDIVISION NO. 3, Meridian: IDR10C1WQ, held by Trilogy Development, Inc.
- 2022-01-10: LAKESIDE DIV. 1, Rigby: IDR10C1WS, held by Knife River
- 2022-01-10: SIMPLOT - WENDELL, ID, Wendell: IDR10C1WU, held by Gentry Civil Corp
LEMHI RIVER MILE 32 ISLAND PHASE among its neighbors
2 discharge permits are in the Muddy Creek-Lemhi River subwatershed (HUC 170602040702); IDR10C1WN is one. Its county: 26, 1 major; IDR10C1WN is minor permit.
Other permits in the Muddy Creek-Lemhi River subwatershed (HUC 170602040702)
- MID-LEMHI REHAB PROJECT HENRY PROPERTY PHASE2, Lemhi: IDR10L0E5
Nearby on the register
- Discharge permits in Lemhi
- Every permit record in Lemhi, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The Muddy Creek-Lemhi River subwatershed holds 2 NPDES permits, including this permit, and LEMHI RIVER MILE 32 ISLAND PHASE is among them. Boyd Foster Backhoe Service, Inc is the permittee, and 0.0% of the 13 storm water construction permits in Lemhi County have a violation on file. Counting this permit, 0.0% of the 8 storm water construction permits in Lemhi County were issued before it.