BLACKFOOT HIGH SCHOOL, held by Headwaters Construction, holds NPDES permit IDR10C22V, which discharges to Blackfoot River. EPA’s file records it issued January 10, 2022 and expiring February 9, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for BLACKFOOT HIGH SCHOOL: its NPDES ID, its permit type and status, its dates, its address in Blackfoot, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C22V.
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | BLACKFOOT HIGH SCHOOL |
|---|---|
| Permittee as filed | Headwaters Construction |
| NPDES ID | IDR10C22V |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expiration date | February 9, 2027 |
| Address | Blackfoot, ID 83221 |
| Receiving water | Blackfoot River |
| Subwatershed | Blackfoot River (HUC 170402070608) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C22V.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C22V.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10C22V.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10C22V.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C22V.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10C22V there.
BLACKFOOT HIGH SCHOOL, Blackfoot, Idaho: Coverage under a general permit IDR10C22V, held by Headwaters Construction; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Blackfoot River.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C22V. Headwaters Construction holds 19 permits in Idaho.
Other permits held by Headwaters Construction
- FLATS AT TETON PEAK, Driggs: IDR10C0ZL, issued 2022-01-10
- SUNPRO CORPORATION CORE 4, Sugar City: IDR10C1AA, issued 2022-01-10
- SUGAR SALEM CTE BUILDING, Sugar City: IDR10C1AR, issued 2022-01-10
- SHERMAN PARK, Victor: IDR10C1NS, issued 2022-01-10
- BLACKFOOT LEGACY SITE DEVELOPMENT, Blackfoot: IDR10C1OW, issued 2022-01-10
- ACE HARDWARE ISLAND PARK, Island Park: IDR10C1P2, issued 2022-01-10
- RIGBY FIELDHOUSE, Rigby: IDR10C1P6, issued 2022-01-10
- JUNIPER HEIGHTS, Pocatello: IDR10C1SQ, issued 2022-01-10
- BERRY OIL FUEL TERMINAL, Idaho Falls: IDR10C1TC, issued 2022-01-10
- ALTURAS ACADEMY, Rigby: IDR10C1U1, issued 2022-01-10
Coverages issued nearest IDR10C22V
- 2022-01-10: ARBOLEDA SUBDIVISION NO. 1, Kuna: IDR10C22Q, held by Tapani, Inc.
- 2022-01-10: ITD D4 KN 21951 - 3250 N TO 3800 N, Twin Falls: IDR10C22R, held by Idaho Transportation Department
- 2022-01-10: VALNOVA TOWN CENTER POD 36, Eagle: IDR10C22S, held by GWC Capital, LLC
- 2022-01-10: JUNIPER COMMONS, Rexburg: IDR10C22T, held by Headwaters Construction
- 2022-01-10: TURNSTONE, Sandpoint: IDR10C22U, held by EVL Construction
- 2022-01-10: SHOSHONI PLAINS VI, Driggs: IDR10C22W, held by Matkin Brothers Excavation
- 2022-01-10: PINNACLE SUBDIVISION DIV. 1, Idaho Falls: IDR10C22X, held by CM Company, Inc.
- 2022-01-10: SALAZAR POINT SUBDIVISION, Nampa: IDR10C22Y, held by Value Homes of Idaho
- 2022-01-10: 21951 US93 3250N TO 3800N (WCI), Filer: IDR10C22Z, held by Western Construction Inc
- 2022-01-10: WALMART FUEL #2831-1004 JEROME, ID, Jerome: IDR10C230, held by Engineered Structures Inc.
BLACKFOOT HIGH SCHOOL among its neighbors
7 discharge permits are in the Blackfoot River subwatershed (HUC 170402070608); IDR10C22V is one. Its county: 22, 2 major; IDR10C22V is minor permit.
Other permits in the Blackfoot River subwatershed (HUC 170402070608)
- 19247 S. FISHER STREET; E. WALKER TO ALICE, Blackfoot: IDR10L08I, term to 2024-01-05
- 19247 S. FISHER STREET; E. WALKER TO ALICE, Blackfoot: IDR10L08J, term to 2024-01-25
- BLACKFOOT SUBSTATION, Blackfoot: IDR10L0MO
- BUILDING DEMO - BLACKFOOT ID, Blackfoot: IDR10L0B8
- HONEYBROOK, Blackfoot: IDR1002TL
- MAVERIK - BLACKFOOT, IDAHO, Blackfoot: IDR10C16B, minor, term to 2027-02-09
Nearby on the register
- Discharge permits in Blackfoot
- Every permit record in Blackfoot, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
BLACKFOOT HIGH SCHOOL sits in Bingham County, where 0.0% of 13 storm water construction permits have a violation on file. The Blackfoot River subwatershed (HUC 170402070608) includes 7 NPDES permits, counting this permit.