NPDES IDR10C25V · Clean Water Act
ALTA HARRIS PARK, Boise, ID: NPDES IDR10C25V discharge permit, effluent exceedances, inspections, penalties
ALTA HARRIS PARK, Boise, Idaho: General permit coverage IDR10C25V, held by City of Boise Parks; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Boise River, Diversion Dam to Veterans Memorial Pa.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C25V.
Coverages issued nearest IDR10C25V
- 2022-01-10: ELEMENT HOTEL PLUS HARROP AVENUE, Driggs: IDR10C25Q, held by Mountain Sky Construction
- 2022-01-10: WAHOOZ - GO-KART ADDITION, Meridian: IDR10C25R, held by McAlvain Construction Inc
- 2022-01-10: HWY 33 EXTENSION, Driggs: IDR10C25S, held by Mountain Sky Construction
- 2022-01-10: KUNA FIRE STATION #2, Kuna: IDR10C25T, held by Scott Hedrick Construction
- 2022-01-10: CIRCLE K - BOEKEL, RATHDRUM, Rathdrum: IDR10C25U, held by Holiday Stationstores NW, LLC
- 2022-01-10: LES SCHWAB TIRE, Moscow: IDR10C25W, held by Steed Construction
- 2022-01-10: WILLOW WOOD ESTATES PHASE 2, Middleton: IDR10C25X, held by Hayden Homes of Idaho
- 2022-01-10: SWIRE COCA COLA - IDAHO FALLS, Idaho Falls: IDR10C25Y, held by Garco Construction
- 2022-01-10: COTTONWOOD - PARCEL B PROPERTY, Cottonwood: IDR10C25Z, held by Simmons Sanitation
- 2022-01-10: NORTH BEACON MIXED USE BLDGS 1-4, Driggs: IDR10C260, held by Steed Construction
ALTA HARRIS PARK among its neighbors
20 discharge permits are in the Warm Springs Creek-Boise River subwatershed (HUC 170501140401); IDR10C25V is one. Its county: 668, 5 major; IDR10C25V is minor permit.
Other permits in the Warm Springs Creek-Boise River subwatershed (HUC 170501140401)
- BARBER PARK PLAZA AND PATHWAYS, Boise: IDR100326
- BARBER PLAZA AND PATHWAY IMPROVEMENT PROJECT 2021, Boise: IDR10030N
- BARBER VALLEY DEVELOPMENT - DALLAS HARRIS ESTATES SUBDIVISION NO. 16, Boise: IDR12B400
- CASCADE, CITY OF - CASCADE WWTP, Cascade: ID0023167, minor, term to 2009-01-01
- DALLAS HARRIS ELEMENTARY, Boise: IDR10C0D4, minor, term to 2027-02-09
- DALLAS HARRIS SOUTH SUBDIVISION NO 2, Boise: IDR10039N, minor, term to 2022-02-15
- EKRT STAGING YARD, Boise: IDR10L0GP
- GLACIER SEWER EXTENSION, Boise: IDR1002VY
- HARRIS RANCH EAST SUBDIVISION, Boise: IDR10C0EC, minor, term to 2027-02-09
- HARRIS RANCH LOT SE-10, Boise: IDR10C1V8, minor, term to 2027-02-09
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ALTA HARRIS PARK |
|---|---|
| Permittee | City of Boise Parks |
| NPDES ID | IDR10C25V |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Boise, ID 83716 |
| Receiving water | Boise River, Diversion Dam to Veterans Memorial Pa |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Warm Springs Creek-Boise River (HUC 170501140401) |
NPDES IDR10C25V: effluent limits and exceedances
ALTA HARRIS PARK (NPDES IDR10C25V): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C25V: no pollutant row on file.
NPDES IDR10C25V: inspections, violations and enforcement
NPDES IDR10C25V (ALTA HARRIS PARK): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C25V
NPDES IDR10C25V: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C25V
NPDES IDR10C25V: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.