FLATS AT TETON PEAKS PHASE 3, Driggs, ID: NPDES IDR10C26N discharge permit, effluent exceedances, inspections, penalties
FLATS AT TETON PEAKS PHASE 3, Driggs, Idaho: General permit coverage IDR10C26N, held by Headwaters Construction; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Teton Creek.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C26N. Headwaters Construction holds 19 permits in Idaho.
Other permits held by Headwaters Construction
- FLATS AT TETON PEAK, Driggs: IDR10C0ZL, issued 2022-01-10
- SUNPRO CORPORATION CORE 4, Sugar City: IDR10C1AA, issued 2022-01-10
- SUGAR SALEM CTE BUILDING, Sugar City: IDR10C1AR, issued 2022-01-10
- SHERMAN PARK, Victor: IDR10C1NS, issued 2022-01-10
- BLACKFOOT LEGACY SITE DEVELOPMENT, Blackfoot: IDR10C1OW, issued 2022-01-10
- ACE HARDWARE ISLAND PARK, Island Park: IDR10C1P2, issued 2022-01-10
- RIGBY FIELDHOUSE, Rigby: IDR10C1P6, issued 2022-01-10
- JUNIPER HEIGHTS, Pocatello: IDR10C1SQ, issued 2022-01-10
- BERRY OIL FUEL TERMINAL, Idaho Falls: IDR10C1TC, issued 2022-01-10
- ALTURAS ACADEMY, Rigby: IDR10C1U1, issued 2022-01-10
Coverages issued nearest IDR10C26N
- 2022-01-10: VALNOVA LOT 29 PHASE 2, Eagle: IDR10C26I, held by GWC Capital dba Valnova LLC
- 2022-01-10: USTICK & LAKE APARTMENTS, Caldwell: IDR10C26J, held by Brighton Construction, Inc.
- 2022-01-10: NORSE LANDING-LCI, Caldwell: IDR10C26K, held by Lurre Construction Inc
- 2022-01-10: MICRON HANGAR (BOI), Boise: IDR10C26L, held by BOISE AIRPORT (City of Boise)
- 2022-01-10: TIMBERLINE HELICOPTERS, Sandpoint: IDR10C26M, held by Jason Cates
- 2022-01-10: BAKER PARK SUBDIVISION NO. 1 (CHALLENGER), Nampa: IDR10C26O, held by Challenger Development, Inc.
- 2022-01-10: MEADOWCREST HEIGHTS SUBDIVISION, Boise: IDR10C26P, held by Lennar Homes of Idaho, LLC
- 2022-01-10: DRY CREEK RANCH VILLAGE NO. 5, Boise: IDR10C26Q, held by Boise Hunter Homes
- 2022-01-10: PINTAIL POND, Parma: IDR10C26R, held by Tyler Archibald
- 2022-01-10: MIDPOINT SUBSTATION EXPANSION, Jerome: IDR10C26S, held by Idaho Power Company
FLATS AT TETON PEAKS PHASE 3 among its neighbors
16 discharge permits are in the Woods Creek-Teton River subwatershed (HUC 170402040203); IDR10C26N is one. Its county: 44, 0 major; IDR10C26N is minor permit.
Other permits in the Woods Creek-Teton River subwatershed (HUC 170402040203)
- 23694 WALLACE AVE, Driggs: IDR10L0E0
- DRIGGS, CITY OF - DRIGGS WWTP, Driggs: ID0020141, minor, term to 2006-09-11
- FLATS AT TETON PEAK, Driggs: IDR10C0ZL, minor, term to 2027-02-09
- HIGHLAND HEIGHTS APARTMENTS, Driggs: IDR10C236, minor, term to 2027-02-09
- NORTH BEACON MIXED USE BLDGS 1-4, Driggs: IDR10C260, minor, term to 2027-02-09
- PIQUET, Driggs: IDR10L0KY
- SH-33 MULTI-MODAL PATHWAY, Driggs: IDR10L0K6
- SHOSHONI PLAINS SUBDIVISION, Driggs: IDR10C0TQ, minor, term to 2027-02-09
- SHOSHONI PLAINS VI, Driggs: IDR10C22W, minor, term to 2027-02-09
- SWEETWATER AIRPARK, Driggs: IDR10C277, minor, term to 2027-02-09
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FLATS AT TETON PEAKS PHASE 3 |
|---|---|
| Permittee | Headwaters Construction |
| NPDES ID | IDR10C26N |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Driggs, ID 83422 |
| Receiving water | Teton Creek |
| Subwatershed | Woods Creek-Teton River (HUC 170402040203) |
NPDES IDR10C26N: effluent limits and exceedances
FLATS AT TETON PEAKS PHASE 3 (NPDES IDR10C26N): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C26N: no pollutant row on file.
NPDES IDR10C26N: inspections, violations and enforcement
NPDES IDR10C26N (FLATS AT TETON PEAKS PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C26N
NPDES IDR10C26N: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C26N
NPDES IDR10C26N: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.