NPDES IDR10L005 · Clean Water Act
BROTHER'S PARK EXPANSION, Caldwell, ID: NPDES IDR10L005 discharge permit, effluent exceedances, inspections, penalties
BROTHER'S PARK EXPANSION, Caldwell, Idaho: General permit coverage IDR10L005, held by City of Caldwell; Construction stormwater; Not needed; issued July 19, 2021, term to November 1, 2021.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 361 were issued before IDR10L005. City of Caldwell holds 2 permits in Idaho.
Other permits held by City of Caldwell
- 500 LATERAL RELOCATION, Caldwell: IDR10026E
Coverages issued nearest IDR10L005
- 2021-07-15: E. 1300 N. ORA ROAD BRIDGE, Ashton: IDR10L003, held by Local Highway Technical Assistance Council
- 2021-07-16: EASTRIVER ROAD MP 10, 11 11.2, Sandpoint: IDR10L000, held by Local Highway Technical Assistance Council
- 2021-07-16: MCDONALD'S 11-0166 SOUTH BOISE, Boise: IDR10L001, held by Conor Craigen
- 2021-07-16: EASTRIVER MP 10 LARIV, Sandpoint: IDR10L002, held by LaRiviere Inc.
- 2021-07-19: EASTRIVER MP 10, 11 - BONNER COUNTY, Sandpoint: IDR10L004, held by Bonner County Road and Bridge
- 2021-07-20: IDAHO GUNS & OUTDOORS, Nampa: IDR10L006, held by RRC Contractors, Inc.
- 2021-07-21: 2L TRAILS HIGHWAY 93 SOUTH, Salmon: IDR10C000, held by The Core Group
- 2021-07-22: FRY CREEK FLOODPLAIN RESTORATION, Bovill: IDR10L007, held by Hatter Creek Earthworks
- 2021-07-23: CITY OF POST FALLS WRF OUTFALL REPLACEMENT-PHASE 1, Post Falls: IDR10C001, held by McMillen, LLC
- 2021-07-28: HARTLEY LANE - MIDDLETON CITY LIMITS TO PURPLE SAGE ROAD, Middleton: IDR10L008, held by Canyon Highway District No. 4
BROTHER'S PARK EXPANSION among its neighbors
62 discharge permits are in the Dixie Slough subwatershed (HUC 170501140802); IDR10L005 is one.
Other permits in the Dixie Slough subwatershed (HUC 170501140802)
- 10TH AVENUE HEIGHTS, Caldwell: IDR100349
- ALYSON MEADOWS SUBDIVISION, Caldwell: IDR10C23O, minor, term to 2027-02-09
- ARROWROCK FARM SUBDIVISION NO 1 (CHALLENGER), Caldwell: IDR10C21C, minor, term to 2027-02-09
- ARROWROCK FARM SUBDIVISION NO. 2, Caldwell: IDR10C1VN, minor, term to 2027-02-09
- BEAR LANE PAVEMENT REHAB 2024, Caldwell: IDR10L0DK
- BRIAN AVENUE APARTMENTS, Caldwell: IDR10C0HJ, minor, term to 2027-02-09
- BROTHER'S PARK, Caldwell: IDR10L00N, term to 2021-11-01
- BUD'S MARKETPLACE, Caldwell: IDR10C1E0, minor, term to 2027-02-09
- CALDWELL PARKS & REC - NEW OFFICE, Caldwell: IDR10L025, term to 2022-12-31
- CALDWELL POOL BATHHOUSE, Caldwell: IDR10L0EN
What stands out
- Its term runs 105 days, July 19, 2021 to November 1, 2021; the term ended 1,779 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as not needed.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | BROTHER'S PARK EXPANSION |
|---|---|
| Permittee | City of Caldwell |
| NPDES ID | IDR10L005 |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 19, 2021 |
| Expires | November 1, 2021 |
| Address | Caldwell, ID 83605 |
| Subwatershed | Dixie Slough (HUC 170501140802) |
NPDES IDR10L005: effluent limits and exceedances
BROTHER'S PARK EXPANSION (NPDES IDR10L005): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10L005: no pollutant row on file.
NPDES IDR10L005: inspections, violations and enforcement
NPDES IDR10L005 (BROTHER'S PARK EXPANSION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10L005
NPDES IDR10L005: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10L005
NPDES IDR10L005: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.