Clean Water Act discharge permit · NPDES IDR10L01L
IDAHO CENTRAL CREDIT UNION- LINDER BRANCH, Meridian, ID: NPDES IDR10L01L discharge permit, effluent exceedances, inspections, penalties
- Not neededPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
IDAHO CENTRAL CREDIT UNION- LINDER BRANCH, held by CM Company Inc, holds NPDES permit IDR10L01L. EPA’s file records it issued December 9, 2021 and expiring July 1, 2022. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for IDAHO CENTRAL CREDIT UNION- LINDER BRANCH: its NPDES ID, its permit type and status, its dates, its address in Meridian, Idaho. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10L01L.
What stands out
- Its term runs 204 days, December 9, 2021 to July 1, 2022; the term ended 1,566 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as not needed.
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility as filed | IDAHO CENTRAL CREDIT UNION- LINDER BRANCH |
|---|---|
| Permittee as filed | CM Company Inc |
| NPDES ID | IDR10L01L |
| Permit status | Not needed |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | December 9, 2021 |
| Expiration date | July 1, 2022 |
| Address | Meridian, ID 83646 |
| Subwatershed | South Slough-Boise River (HUC 170501140405) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10L01L.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10L01L.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10L01L.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10L01L.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10L01L.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10L01L there.
IDAHO CENTRAL CREDIT UNION- LINDER BRANCH, Meridian, Idaho: Coverage under a general permit IDR10L01L, held by CM Company Inc; Construction stormwater; Not needed; issued December 9, 2021, term to July 1, 2022.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 537 were issued before IDR10L01L.
Coverages issued nearest IDR10L01L
- 2021-12-08: GREEN HILLS LANDING SUBDIVISION PHASE 1, Caldwell: IDR10C052, held by Hess Properties
- 2021-12-08: CRAFTSMAN ESTATES NO. 5, Star: IDR10C053, held by Tresidio Homes
- 2021-12-09: SH-21 WILDLIFE OVERPASS AT CERVIDAE PEAK, MP 19.3, Boise: IDR10L01I, held by Federal Highway Administration
- 2021-12-09: LEIGHTON CONTRACTOR SHOP, Eagle: IDR10L01J, held by Idaho Materials and Construction
- 2021-12-09: ESTHER SIMPLOT POND, Boise: IDR10L01K, held by TDX Power Services, LLC
- 2021-12-13: BRITTANY HEIGHTS SUBDIVISION NO 3, Caldwell: IDR10C055, held by Windsor Creek Properties, LLC
- 2021-12-13: SELLWOOD PLACE PHASE 1, Star: IDR10C056, held by Providence Properties, LLC
- 2021-12-13: GREENDALE GROVE SUBDIVISION NO 1, Star: IDR10C057, held by Greendale Grove Properties, LLC
- 2021-12-13: PEREGRINE TOWNHOMES, Sugar City: IDR10C058, held by Summit Building Group LLC
- 2021-12-15: FMG SNOW REMOVAL BUILDING, Boise: IDR10C05A, held by EKC, Inc.
IDAHO CENTRAL CREDIT UNION- LINDER BRANCH among its neighbors
141 discharge permits are in the South Slough-Boise River subwatershed (HUC 170501140405); IDR10L01L is one.
Other permits in the South Slough-Boise River subwatershed (HUC 170501140405)
- 2ND SPACE STORAGE, Meridian: IDR10C1G9, minor, term to 2027-02-09
- 4120 N. LINDER RD. COMMERCIAL, Meridian: IDR10035O, minor, term to 2022-02-15
- 55 RESORT AT VERANO PLACE, Meridian: IDR10C06V, minor, term to 2022-02-16
- ACHD CT226-07: LIBERTY ST: DOUGLAS ST. TO DENTON ST., Boise: IDR10C1VT, minor, term to 2027-02-09
- ADDISON CIRCLE SUBDIVSION, Meridian: IDR10C1R9, minor, term to 2027-02-09
- ADERO PARK SUBDIVISION NO 2, Meridian: IDR10C1UM, minor, term to 2027-02-09
- ADERO PARK SUBDIVISION NO 2, Meridian: IDR10C1UN, minor, term to 2027-02-09
- ALICIA COURT SUBDIVISION, Meridian: IDR10024C
- ALPINE ST, ORCHARD ST TO RANDALL ST, Boise: IDR100071
- AMBLESIDE SUBDIVISION NO 1, Boise: IDR100376
Nearby on the register
- Discharge permits in Meridian
- Every permit record in Meridian, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
Among the 271 storm water construction permits in Meridian, 0.0% have a violation on file. IDAHO CENTRAL CREDIT UNION- LINDER BRANCH joins 141 NPDES permits in the South Slough-Boise River subwatershed.