EPIC SHINE ORCHARD, Meridian, Idaho: General permit coverage IDR10L02A, held by stack Construction; Construction stormwater; Not needed; issued February 25, 2022, term to November 18, 2022.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 1,792 were issued before IDR10L02A. stack Construction holds 5 permits in Idaho.
Other permits held by stack Construction
- EPIC SHINE OVERLAND, Meridian: IDR10L026, issued 2022-02-25
- BURDGE OFFICE BUILDING, Meridian: IDR10L027, issued 2022-02-25
- WEST VALLEY LAND OFFICE, Meridian: IDR10L028, issued 2022-02-25
- BALMSHOT BUILDING, Eagle: IDR10L029, issued 2022-02-25
Coverages issued nearest IDR10L02A
- 2022-02-23: TEAKWOOD, Meridian: IDR10C07E, held by JBI Elemental
- 2022-02-25: EPIC SHINE OVERLAND, Meridian: IDR10L026, held by stack Construction
- 2022-02-25: BURDGE OFFICE BUILDING, Meridian: IDR10L027, held by stack Construction
- 2022-02-25: WEST VALLEY LAND OFFICE, Meridian: IDR10L028, held by stack Construction
- 2022-02-25: BALMSHOT BUILDING, Eagle: IDR10L029, held by stack Construction
- 2022-02-25: BORAH HIGH SCHOOL, Boise: IDR10L02B, held by Beniton Construction Company, Inc.
- 2022-02-25: TIMBERLINE HIGH SCHOOL, Boise: IDR10L02C, held by Beniton Construction Company, Inc.
- 2022-02-25: JARED & AMY PARKER, Arimo: IDR10L02D, held by Slash JP Livestock
- 2022-02-25: HAYDEN REACH - LEMHI RIVER TEMPORARY BRIDGE, Lemhi: IDR10L02E, held by Bird Excavation LLC
- 2022-02-28: ADA COUNTY CORONER'S FACILITY, Meridian: IDR10C07O, held by Ada County Operations
EPIC SHINE ORCHARD among its neighbors
358 discharge permits are in the Lower Indian Creek subwatershed (HUC 170501140507); IDR10L02A is one.
Other permits in the Lower Indian Creek subwatershed (HUC 170501140507)
- 11TH AVE S 2-WAY CONVERSION CITY OF NAMPA, Nampa: IDR10L0LN
- 11TH AVE S TWO-WAY CONVERSION, Nampa: IDR10L0LO
- 12TH-15TH 2ND-7TH ST. SOUTH WATERLINES REPLACEMENT, Nampa: IDR10C27N, minor, term to 2027-02-09
- 1908 SUNNY RIDGE, Nampa: IDR1001JD
- 1ST ST. & ROOSEVELT AVE. WATERLINE, Nampa: IDR1000GJ
- 2025 ARTERIAL & COLLECTOR CAPITAL MAINTENANCE, Kuna: IDR10C1UW, minor, term to 2027-02-09
- 203 AND 212 1ST AVE., Nampa: IDR10L0J9
- 21ST AVENUE MARRIOTT, Caldwell: IDR10C1IN, minor, term to 2027-02-09
- 24229 MIDDLETON RD, SH 55 TO FLAMINGO AVE, Nampa: IDR10L0LR
- 6TH STREET MULTI-PLEXES, Nampa: IDR1001D8
What stands out
- Its term runs 266 days, February 25, 2022 to November 18, 2022; the term ended 1,397 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as not needed.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | EPIC SHINE ORCHARD |
|---|---|
| Permittee | stack Construction |
| NPDES ID | IDR10L02A |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 25, 2022 |
| Expires | November 18, 2022 |
| Address | Meridian, ID 83646 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lower Indian Creek (HUC 170501140507) |
NPDES IDR10L02A: effluent limits and exceedances
EPIC SHINE ORCHARD (NPDES IDR10L02A): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10L02A: no pollutant row on file.
NPDES IDR10L02A: inspections, violations and enforcement
NPDES IDR10L02A (EPIC SHINE ORCHARD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10L02A
NPDES IDR10L02A: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10L02A
NPDES IDR10L02A: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.