NPDES IDR10L09V · Clean Water Act
SWAN FALLS ACCESS ROAD PHASE II, Kuna, ID: NPDES IDR10L09V discharge permit, effluent exceedances, inspections, penalties
SWAN FALLS ACCESS ROAD PHASE II, Kuna, Idaho: General permit coverage IDR10L09V, held by Idaho Power Company; Construction stormwater; Not needed.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Idaho Power Company holds 48 permits in Idaho.
Other permits held by Idaho Power Company
- LANSING SUBSTATION, Middleton: IDR1000L4
- FILER SUBSTATION, Filer: IDR1001QK
- LINE 440 REBUILD, Picabo: IDR10020Y
- UPPER MALAD UNDERGROUND POWERLINE, Hagerman: IDR10027Z
- BEACON LIGHT SUBSTATION, Eagle: IDR100280
- WARM LAKE UNDERGROUND, Yellow Pine: IDR1002I4
- MIDPOINT STAGING YARD, Jerome: IDR1002KF
- EMMETT YARD DRAINAGE IMPROVEMENTS, Emmett: IDR1002UP
- LINE 172 REBUILD, Jerome: IDR1002WJ, issued 2021-01-26
- CALDWELL ROADS, Caldwell: IDR10033N, issued 2021-04-26
SWAN FALLS ACCESS ROAD PHASE II among its neighbors
1 discharge permits are in the Swan Falls Dam-Snake River subwatershed (HUC 170501030409); IDR10L09V is one. Its county: 668, 5 major; IDR10L09V is a permit EPA has not classed major or minor.
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | SWAN FALLS ACCESS ROAD PHASE II |
|---|---|
| Permittee | Idaho Power Company |
| NPDES ID | IDR10L09V |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Kuna, ID 83634 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Swan Falls Dam-Snake River (HUC 170501030409) |
NPDES IDR10L09V: effluent limits and exceedances
SWAN FALLS ACCESS ROAD PHASE II (NPDES IDR10L09V): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10L09V: no pollutant row on file.
NPDES IDR10L09V: inspections, violations and enforcement
NPDES IDR10L09V (SWAN FALLS ACCESS ROAD PHASE II): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10L09V
NPDES IDR10L09V: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10L09V
NPDES IDR10L09V: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.