Velarion Records
Free: one email when NPDES IDR10L0CW changes. Unsubscribe any time.

NPDES IDR10L0CW · Clean Water Act

ASHTON WWTP HEADWORKS PROJECT, Ashton, ID: NPDES IDR10L0CW discharge permit, effluent exceedances, inspections, penalties

ASHTON WWTP HEADWORKS PROJECT, Ashton, Idaho: General permit coverage IDR10L0CW, held by Brian Edstrom; Construction stormwater; Not needed.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Brian Edstrom holds 7 permits in Idaho.

Other permits held by Brian Edstrom

ASHTON WWTP HEADWORKS PROJECT among its neighbors

1 discharge permits are in the Blue Creek-Lower Henrys Fork subwatershed (HUC 170402020701); IDR10L0CW is one. Its county: 15, 0 major; IDR10L0CW is a permit EPA has not classed major or minor.

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.

Identity

FacilityASHTON WWTP HEADWORKS PROJECT
PermitteeBrian Edstrom
NPDES IDIDR10L0CW
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressAshton, ID 83420
SubwatershedBlue Creek-Lower Henrys Fork (HUC 170402020701)

NPDES IDR10L0CW: effluent limits and exceedances

ASHTON WWTP HEADWORKS PROJECT (NPDES IDR10L0CW): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10L0CW: no pollutant row on file.

NPDES IDR10L0CW: inspections, violations and enforcement

NPDES IDR10L0CW (ASHTON WWTP HEADWORKS PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10L0CW

NPDES IDR10L0CW: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10L0CW

NPDES IDR10L0CW: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.