Velarion Records
Free: one email when NPDES IDR10L0FS changes. Unsubscribe any time.

NPDES IDR10L0FS · Clean Water Act

BEEHIVE BEND TAKEOUT AND WALKWAY, Horseshoe Bend, ID: NPDES IDR10L0FS discharge permit, effluent exceedances, inspections, penalties

BEEHIVE BEND TAKEOUT AND WALKWAY, Horseshoe Bend, Idaho: General permit coverage IDR10L0FS, held by C-2 Construction Inc.; Construction stormwater; Not needed.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file.

BEEHIVE BEND TAKEOUT AND WALKWAY among its neighbors

4 discharge permits are in the Fleming Creek-Payette River subwatershed (HUC 170501220104); IDR10L0FS is one.

Other permits in the Fleming Creek-Payette River subwatershed (HUC 170501220104)

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.

Identity

FacilityBEEHIVE BEND TAKEOUT AND WALKWAY
PermitteeC-2 Construction Inc.
NPDES IDIDR10L0FS
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressHorseshoe Bend, ID 83629
SubwatershedFleming Creek-Payette River (HUC 170501220104)

NPDES IDR10L0FS: effluent limits and exceedances

BEEHIVE BEND TAKEOUT AND WALKWAY (NPDES IDR10L0FS): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10L0FS: no pollutant row on file.

NPDES IDR10L0FS: inspections, violations and enforcement

NPDES IDR10L0FS (BEEHIVE BEND TAKEOUT AND WALKWAY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10L0FS

NPDES IDR10L0FS: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10L0FS

NPDES IDR10L0FS: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.