Velarion Records
Free: one email when NPDES IDR10L0G7 changes. Unsubscribe any time.

NPDES IDR10L0G7 · Clean Water Act

BILOBA SUBDIVISION, Boise, ID: NPDES IDR10L0G7 discharge permit, effluent exceedances, inspections, penalties

BILOBA SUBDIVISION, Boise, Idaho: General permit coverage IDR10L0G7, held by Wood Brothers; Construction stormwater; Not needed.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Wood Brothers holds 2 permits in Idaho.

Other permits held by Wood Brothers

BILOBA SUBDIVISION among its neighbors

223 discharge permits are in the North Slough-Boise River subwatershed (HUC 170501140404); IDR10L0G7 is one.

Other permits in the North Slough-Boise River subwatershed (HUC 170501140404)

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.

Identity

FacilityBILOBA SUBDIVISION
PermitteeWood Brothers
NPDES IDIDR10L0G7
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressBoise, ID 83703
SubwatershedNorth Slough-Boise River (HUC 170501140404)

NPDES IDR10L0G7: effluent limits and exceedances

BILOBA SUBDIVISION (NPDES IDR10L0G7): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10L0G7: no pollutant row on file.

NPDES IDR10L0G7: inspections, violations and enforcement

NPDES IDR10L0G7 (BILOBA SUBDIVISION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10L0G7

NPDES IDR10L0G7: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10L0G7

NPDES IDR10L0G7: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.