Velarion Records
Free: one email when NPDES IDR10L0IO changes. Unsubscribe any time.

NPDES IDR10L0IO · Clean Water Act

BROOKHAVEN POND, Middleton, ID: NPDES IDR10L0IO discharge permit, effluent exceedances, inspections, penalties

BROOKHAVEN POND, Middleton, Idaho: General permit coverage IDR10L0IO, held by Joseph Austin; Construction stormwater; Not needed.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file.

BROOKHAVEN POND among its neighbors

197 discharge permits are in the Mill Slough-Boise River subwatershed (HUC 170501140410); IDR10L0IO is one.

Other permits in the Mill Slough-Boise River subwatershed (HUC 170501140410)

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.

Identity

FacilityBROOKHAVEN POND
PermitteeJoseph Austin
NPDES IDIDR10L0IO
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressMiddleton, ID 83644
SubwatershedMill Slough-Boise River (HUC 170501140410)

NPDES IDR10L0IO: effluent limits and exceedances

BROOKHAVEN POND (NPDES IDR10L0IO): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10L0IO: no pollutant row on file.

NPDES IDR10L0IO: inspections, violations and enforcement

NPDES IDR10L0IO (BROOKHAVEN POND): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10L0IO

NPDES IDR10L0IO: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10L0IO

NPDES IDR10L0IO: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.