Velarion Records
Free: one email when NPDES IDR10L0IV changes. Unsubscribe any time.

NPDES IDR10L0IV · Clean Water Act

LAST CHANCE PHASE 2, Ellis, ID: NPDES IDR10L0IV discharge permit, effluent exceedances, inspections, penalties

LAST CHANCE PHASE 2, Ellis, Idaho: General permit coverage IDR10L0IV, held by Down to Earth Excavation llc; Construction stormwater; Not needed.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Down to Earth Excavation llc holds 2 permits in Idaho.

Other permits held by Down to Earth Excavation llc

LAST CHANCE PHASE 2 among its neighbors

1 discharge permits are in the Cabin Creek-Salmon River subwatershed (HUC 170602030203); IDR10L0IV is one.

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.

Identity

FacilityLAST CHANCE PHASE 2
PermitteeDown to Earth Excavation llc
NPDES IDIDR10L0IV
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressEllis, ID 83235
SubwatershedCabin Creek-Salmon River (HUC 170602030203)

NPDES IDR10L0IV: effluent limits and exceedances

LAST CHANCE PHASE 2 (NPDES IDR10L0IV): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10L0IV: no pollutant row on file.

NPDES IDR10L0IV: inspections, violations and enforcement

NPDES IDR10L0IV (LAST CHANCE PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10L0IV

NPDES IDR10L0IV: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10L0IV

NPDES IDR10L0IV: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.