Velarion Records
Free: one email when NPDES IDR10L0KT changes. Unsubscribe any time.

NPDES IDR10L0KT · Clean Water Act

PREFERRED PUMP SITE IMPROVEMENTS, Caldwell, ID: NPDES IDR10L0KT discharge permit, effluent exceedances, inspections, penalties

PREFERRED PUMP SITE IMPROVEMENTS, Caldwell, Idaho: General permit coverage IDR10L0KT, held by Idaho Materials & Construction; Not needed.

Other permits held by Idaho Materials & Construction

PREFERRED PUMP SITE IMPROVEMENTS among its neighbors

11 discharge permits are in the Outlet Boise River subwatershed (HUC 170501140803); IDR10L0KT is one. Its county: 377, 2 major; IDR10L0KT is a permit EPA has not classed major or minor.

Other permits in the Outlet Boise River subwatershed (HUC 170501140803)

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; the file names no program for it.

Identity

FacilityPREFERRED PUMP SITE IMPROVEMENTS
PermitteeIdaho Materials & Construction
NPDES IDIDR10L0KT
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
AddressCaldwell, ID 83605
SubwatershedOutlet Boise River (HUC 170501140803)

NPDES IDR10L0KT: effluent limits and exceedances

PREFERRED PUMP SITE IMPROVEMENTS (NPDES IDR10L0KT): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10L0KT: no pollutant row on file.

NPDES IDR10L0KT: inspections, violations and enforcement

NPDES IDR10L0KT (PREFERRED PUMP SITE IMPROVEMENTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10L0KT

NPDES IDR10L0KT: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10L0KT

NPDES IDR10L0KT: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.