FULLER SUBSTATION & INTERCONNECTION PROJECT, Meppen, IL: NPDES ILR10ZB8I discharge permit, effluent exceedances, inspections, penalties

FULLER SUBSTATION & INTERCONNECTION PROJECT, Meppen, Illinois: General permit coverage ILR10ZB8I, held by Ameren Illinois; Construction stormwater; Effective; issued August 9, 2023, term to August 31, 2028, by IEPA.

Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 130 were issued before ILR10ZB8I. Ameren Illinois holds 5 permits in Illinois.

Other permits held by Ameren Illinois

Coverages issued nearest ILR10ZB8I

  • 2023-08-09: CONTRACT 66H15, Dwight: ILR10ZANM, held by D Construction, Inc.
  • 2023-08-09: DPI LIBERTYVILLE, Libertyville: ILR10ZAPA, held by A-1 Northshore Construction Inc.
  • 2023-08-09: CONTRACT 66B52, Utica: ILR10ZAPC, held by R.W. Dunteman Company
  • 2023-08-09: 66997, Kankakee: ILR10ZB4X, held by Kankakee Valley Construction Company, Inc
  • 2023-08-09: RIVIAN N1.0 WEST EXPANSION, Normal: ILR10ZB4Y, held by Walbridge-River City Construction Joint Venture (WRC)
  • 2023-08-09: LOCAL 520 TRAINING FACILITY, St. Jacob: ILR10ZB9I, held by International Union of Operating Engineers Local 520 - JATC
  • 2023-08-09: CONTRACT NO. 66F11, Bourbonnais: ILR10ZBA2, held by D Construction
  • 2023-08-09: WICKSTROM LINCOLN BUILDING, Barrington: ILR10ZBJM, held by Wickstrom Auto Group
  • 2023-08-09: WEST APRON EXPANSION, Peoria: ILR10ZBJP, held by TBD
  • 2023-08-09: 66F74, Kankakee: ILR10ZBKW, held by KANKAKEE VALLEY CONST CO & TOBEYS CONSTRUCTION & CARTAGE,INC.

FULLER SUBSTATION & INTERCONNECTION PROJECT among its neighbors

2 discharge permits are in the Swan Lake subwatershed (HUC 071300111005); ILR10ZB8I is one.

Other permits in the Swan Lake subwatershed (HUC 071300111005)

  • BATCHTOWN WTP, Calhoun County: ILG640013, minor, term to 2017-04-30

What stands out

  • Its term runs 5 years and 22 days, August 9, 2023 to August 31, 2028.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityFULLER SUBSTATION & INTERCONNECTION PROJECT
PermitteeAmeren Illinois
NPDES IDILR10ZB8I
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedAugust 9, 2023
ExpiresAugust 31, 2028
AgencyIEPA
AddressMeppen, IL 62031
SubwatershedSwan Lake (HUC 071300111005)

NPDES ILR10ZB8I: effluent limits and exceedances

FULLER SUBSTATION & INTERCONNECTION PROJECT (NPDES ILR10ZB8I): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES ILR10ZB8I: no pollutant row on file.

NPDES ILR10ZB8I: inspections, violations and enforcement

NPDES ILR10ZB8I (FULLER SUBSTATION & INTERCONNECTION PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES ILR10ZB8I

NPDES ILR10ZB8I: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES ILR10ZB8I

NPDES ILR10ZB8I: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.