NPDES ILR10ZCN3 · Clean Water Act
BNSF - OGDEN YARD RECONFIGURATION, Cicero, IL: NPDES ILR10ZCN3 discharge permit, effluent exceedances, inspections, penalties
BNSF - OGDEN YARD RECONFIGURATION, Cicero, Illinois: General permit coverage ILR10ZCN3, held by Granite K-Five Joint Venture; Construction stormwater; Effective; issued September 27, 2023, term to August 31, 2028, by IEPA.
Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 722 were issued before ILR10ZCN3. Granite K-Five Joint Venture holds 2 permits in Illinois.
Other permits held by Granite K-Five Joint Venture
- BNSF - WESTERN YARD IMPROVEMENTS, Chicago: ILR10ZDU5, issued 2024-03-21
Coverages issued nearest ILR10ZCN3
- 2023-09-27: MARBLE LANDING, Lemont: ILR10Z541, held by Teton Development
- 2023-09-27: CONTRACT 70B99 I-74/I-57 INTERCHANGE RECONSTRUCTION, Champaign: ILR10ZARY, held by William Charles Construction Company and White Construction Joint Venture
- 2023-09-27: RANDALL SQUARE PARCEL 6, North Aurora: ILR10ZCKI, held by RE Development Solutions
- 2023-09-27: PROPOSED ROMEO CROSSING COMMUNITY PARK, Romeoville: ILR10ZCLZ, held by TBD
- 2023-09-27: RESIDENCES AT FOX MEADOWS, Mchenry: ILR10ZCM7, held by Fox Meadows, Phase I, LLC
- 2023-09-27: GSG WIND REPOWER PROJECT, Mendota: ILR10ZCTW, held by Boldt Enterprises
- 2023-09-27: VOSS ROAD RESIDENCE, Marengo: ILR10ZD7L, held by Advanced Design Studio LTD
- 2023-09-27: LAKEFRONT PARK, Village Of Fox Lake: ILR10ZD7M, held by Copenhaver Construction
- 2023-09-27: EVERGREEN AVENUE DEVELOPMENT, Effingham: ILR10ZD7O, held by Kabbes Properties
- 2023-09-27: MOOSEHEART LIFT STATION, FORCEMAIN AND GRAVITY SEWER CONNECTION TO FOX METRO WRD, Mooseheart: ILR10ZD7Y, held by Endpoint Solutions
BNSF - OGDEN YARD RECONFIGURATION among its neighbors
132 discharge permits are in the Maple Lake-Chicago Sanitary and Ship Canal subwatershed (HUC 071200040705); ILR10ZCN3 is one.
Other permits in the Maple Lake-Chicago Sanitary and Ship Canal subwatershed (HUC 071200040705)
- 151ST STREET WIDENING PROJECT, Lockport: ILR10ZC33, minor, term to 2028-08-31
- 2015: I-355 BRIDGE REHABILITATION OVER DES PLAINES RIVER VALLEY, Lemont: ILR10ZG4L, minor, term to 2028-08-31
- 2024 ROADWAY AND WATER MAIN IMPROVEMENTS, Lockport: ILR10ZDQZ, minor, term to 2028-08-31
- 4597: MILE LONG BRIDGE, Burr Ridge: ILR10ZBO9, minor, term to 2028-08-31
- 4913: I-355 EARTHWORK AND GRADING IMPROVEMENTS AT 127TH STREET, Lemont: ILR10ZDMM, minor, term to 2028-08-31
- 88TH/CORK AVENUE AT I-294 INTERCHANGE, Justice: ILR10ZELT, minor, term to 2028-08-31
- AQUATIC NUISANCE SPECIES DISPERSAL BARRIER IIB, Romeoville: IL0079201, minor, term to 2020-08-31
- ARCWOOD ENVIRONMENTAL, LLC, Lemont: IL0068888, minor, term to 2024-07-31
- ARGO FACILITY/EQUILON ENTERPR, Bedford Park: ILR001072, minor, term to 2008-06-01
- ARGO HIGH SCHOOL ATHLETIC FIELDS, Summit: ILR10ZH5G, minor, term to 2028-08-31
What stands out
- Its term runs 4 years and 339 days, September 27, 2023 to August 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BNSF - OGDEN YARD RECONFIGURATION |
|---|---|
| Permittee | Granite K-Five Joint Venture |
| NPDES ID | ILR10ZCN3 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 27, 2023 |
| Expires | August 31, 2028 |
| Agency | IEPA |
| Address | Cicero, IL 60804 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Maple Lake-Chicago Sanitary and Ship Canal (HUC 071200040705) |
NPDES ILR10ZCN3: effluent limits and exceedances
BNSF - OGDEN YARD RECONFIGURATION (NPDES ILR10ZCN3): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ILR10ZCN3: no pollutant row on file.
NPDES ILR10ZCN3: inspections, violations and enforcement
NPDES ILR10ZCN3 (BNSF - OGDEN YARD RECONFIGURATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ILR10ZCN3
NPDES ILR10ZCN3: one email when its EPA record changes — $99/month.
Permits near NPDES ILR10ZCN3
NPDES ILR10ZCN3: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.