Velarion Records
Free: one email when NPDES ILR10ZE08 changes. Unsubscribe any time.

NPDES ILR10ZE08 · Clean Water Act

DENALI HEIGHTS PLATS 2-5, Roscoe, IL: NPDES ILR10ZE08 discharge permit, effluent exceedances, inspections, penalties

DENALI HEIGHTS PLATS 2-5, Roscoe, Illinois: General permit coverage ILR10ZE08, held by Selene Homes; Construction stormwater; Effective; issued April 26, 2024, term to August 31, 2028, by IEPA.

  • November 12, 2025: Failure to properly operate or maintain construction stormwater controls (ST6).
  • November 12, 2025: Other noncompliance related to construction stormwater discharges (ST6).
  • October 2, 2025: Other noncompliance related to construction stormwater discharges (ST6).
  • May 30, 2025: Failure to properly operate or maintain construction stormwater controls (ST6).
  • May 30, 2025: Failure to properly conduct construction stormwater inspections (ST6).
  • May 30, 2025: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
  • May 30, 2025: Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] (ST6).
  • May 30, 2025: Failure to submit required application or NOI regarding construction stormwater discharges (ST6).

Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 1,512 were issued before ILR10ZE08.

Coverages issued nearest ILR10ZE08

DENALI HEIGHTS PLATS 2-5 among its neighbors

23 discharge permits are in the City of Rockton-Rock River subwatershed (HUC 070900050104); ILR10ZE08 is one.

Other permits in the City of Rockton-Rock River subwatershed (HUC 070900050104)

What stands out

  • Its term runs 4 years and 127 days, April 26, 2024 to August 31, 2028.
  • Its newest dated event on file is a single-event violation on November 12, 2025, 307 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 3 single-event violations.
  • EPA's file dates 8 events for it, all in 2025.
  • It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityDENALI HEIGHTS PLATS 2-5
PermitteeSelene Homes
NPDES IDILR10ZE08
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedApril 26, 2024
ExpiresAugust 31, 2028
AgencyIEPA
AddressRoscoe, IL 61073
SubwatershedCity of Rockton-Rock River (HUC 070900050104)

NPDES ILR10ZE08: effluent limits and exceedances

DENALI HEIGHTS PLATS 2-5 (NPDES ILR10ZE08): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES ILR10ZE08: no pollutant row on file.

NPDES ILR10ZE08: inspections, violations and enforcement

NPDES ILR10ZE08: 8 single-event violations

DateWhat EPA recordedAgency
November 12, 2025Failure to properly operate or maintain construction stormwater controlsST6
November 12, 2025Other noncompliance related to construction stormwater dischargesST6
October 2, 2025Other noncompliance related to construction stormwater dischargesST6
May 30, 2025Failure to properly operate or maintain construction stormwater controlsST6
May 30, 2025Failure to properly conduct construction stormwater inspectionsST6
May 30, 2025Failure to properly install, initiate, or fully implement construction stormwater controlsST6
May 30, 2025Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)]ST6
May 30, 2025Failure to submit required application or NOI regarding construction stormwater dischargesST6

NPDES ILR10ZE08 (DENALI HEIGHTS PLATS 2-5): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES ILR10ZE08

NPDES ILR10ZE08: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES ILR10ZE08

NPDES ILR10ZE08: 0 pollutant rows, 8 dated events; ICIS-NPDES download, loaded September 15, 2026.