Velarion Records
Free: one email when NPDES ILR10ZF1S changes. Unsubscribe any time.

NPDES ILR10ZF1S · Clean Water Act

JUBILEE POINT PARK (TOWN CENTRE) FINAL DESIGN PHASE TWO, Woodridge, IL: NPDES ILR10ZF1S discharge permit, effluent exceedances, inspections, penalties

JUBILEE POINT PARK (TOWN CENTRE) FINAL DESIGN PHASE TWO, Woodridge, Illinois: General permit coverage ILR10ZF1S, held by To Be Determined; Construction stormwater; Effective; issued February 18, 2025, term to August 31, 2028, by IEPA.

Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 2,536 were issued before ILR10ZF1S. To Be Determined holds 44 permits in Illinois.

Other permits held by To Be Determined

Coverages issued nearest ILR10ZF1S

JUBILEE POINT PARK (TOWN CENTRE) FINAL DESIGN PHASE TWO among its neighbors

57 discharge permits are in the East Branch Du Page River subwatershed (HUC 071200040804); ILR10ZF1S is one.

Other permits in the East Branch Du Page River subwatershed (HUC 071200040804)

What stands out

  • Its term runs 3 years and 195 days, February 18, 2025 to August 31, 2028.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityJUBILEE POINT PARK (TOWN CENTRE) FINAL DESIGN PHASE TWO
PermitteeTo Be Determined
NPDES IDILR10ZF1S
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedFebruary 18, 2025
ExpiresAugust 31, 2028
AgencyIEPA
AddressWoodridge, IL 60517
SubwatershedEast Branch Du Page River (HUC 071200040804)

NPDES ILR10ZF1S: effluent limits and exceedances

JUBILEE POINT PARK (TOWN CENTRE) FINAL DESIGN PHASE TWO (NPDES ILR10ZF1S): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES ILR10ZF1S: no pollutant row on file.

NPDES ILR10ZF1S: inspections, violations and enforcement

NPDES ILR10ZF1S (JUBILEE POINT PARK (TOWN CENTRE) FINAL DESIGN PHASE TWO): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES ILR10ZF1S

NPDES ILR10ZF1S: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES ILR10ZF1S

NPDES ILR10ZF1S: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.