Clean Water Act discharge permit · NPDES ILR10ZF36
THREE OAKS ROAD IMPROVEMENTS, Crystal Lake, IL: NPDES ILR10ZF36 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
THREE OAKS ROAD IMPROVEMENTS, held by Curran Contracting, holds NPDES permit ILR10ZF36. EPA’s file records it issued February 7, 2025 and expiring August 31, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for THREE OAKS ROAD IMPROVEMENTS: its NPDES ID, its permit type and status, its dates, its address in Crystal Lake, Illinois. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES ILR10ZF36.
What stands out
- Its term runs 3 years and 206 days, February 7, 2025 to August 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 10,926 discharge permits on the register in Illinois; 5,215 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | THREE OAKS ROAD IMPROVEMENTS |
|---|---|
| Permittee as filed | Curran Contracting |
| NPDES ID | ILR10ZF36 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | February 7, 2025 |
| Expiration date | August 31, 2028 |
| Issuing agency | IEPA |
| Address | Crystal Lake, IL 60014 |
| Subwatershed | Spring Creek-Fox River (HUC 071200061202) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES ILR10ZF36.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES ILR10ZF36.
Inspections
EPA’s inspection file holds no inspection for NPDES ILR10ZF36.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES ILR10ZF36.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, ILR10ZF36.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID ILR10ZF36 there.
THREE OAKS ROAD IMPROVEMENTS, Crystal Lake, Illinois: Coverage under a general permit ILR10ZF36, held by Curran Contracting; Construction stormwater; Effective; issued February 7, 2025, term to August 31, 2028, by IEPA.
Illinois holds 5,215 Construction stormwater coverages of this permit type in EPA’s file; 2,478 were issued before ILR10ZF36.
Coverages issued nearest ILR10ZF36
- 2025-02-07: HELUKABEL USA - BUILDING EXPANSION, West Dundee: ILR10ZF1D, held by Benchmark Developers, Inc.
- 2025-02-07: A NEW CLINIC BUILDING: CRUSADER COMMUNITY HEALTH, Rockford: ILR10ZF1H, held by TBD
- 2025-02-07: SCHULTZ SITE IMPROVEMENTS, East Peoria: ILR10ZF1M, held by TBD
- 2025-02-07: VILLAGE OF OWANECO WATER MAIN REPLACEMENT, Owaneco: ILR10ZF2V, held by Bryant Construction Company, Inc.
- 2025-02-07: TR 03 GAS LINE, New Athens: ILR10ZF2Z, held by Thomas Fahey
- 2025-02-07: PATRIOT ACRES PHASE 2, Des Plaines: ILR10ZF37, held by Patriot Acres, LLC
- 2025-02-07: SOUTH FORTY DEVELOPMENT / LIFE TIME, Naperville: ILR10ZF38, held by Life Time
- 2025-02-07: SUNRISE PARK OSLAD DEVELOPMENT, Bartlett: ILR10ZF39, held by Bartlett Park District
- 2025-02-07: WHITE WILLOW SUN 1 WHITE WILLOW SUN 2 WHITE WILLOW SUN 3 (CO-LOCATED PROJECTS), Village Of Lisbon: ILR10ZF3E, held by Nexamp, Inc.
- 2025-02-07: ROUTE 125 POND, Pleasant Plains: ILR10ZF3L, held by Dan Paul
THREE OAKS ROAD IMPROVEMENTS among its neighbors
21 discharge permits are in the Spring Creek-Fox River subwatershed (HUC 071200061202); ILR10ZF36 is one.
Other permits in the Spring Creek-Fox River subwatershed (HUC 071200061202)
- 110 REMINGTON, Barrington Hills: ILR10ZEK3, minor, term to 2028-08-31
- ALDEN HORIZON - CARY, Cary: ILR10ZEXC, minor, term to 2028-08-31
- BARRINGTON HILLS RESIDENCE (WEST SITE), Barrington Hills: ILR10ZGBS, minor, term to 2028-08-31
- CAMP ALGONQUIN STP, Algonquin: IL0031917, minor, term to 2009-07-31
- CARROLL RESIDENCE, Barrington Hills: ILR10ZDHT, minor, term to 2028-08-31
- CARY PARK DISTRICT, Cary: ILG870310, minor, term to 2021-10-31
- CARY WWTP, VILLAGE OF, Cary: IL0020516, major, term to 2017-10-31
- CARY, VILLAGE OF, Cary: ILG870340, minor, term to 2021-10-31
- FOX RIVER GROVE STP, Fox River Grove: ILL020583, minor, term to 2025-12-31
- FOX RIVER GROVE WWTP, Fox River Grove: IL0020583, major, term to 2018-04-30
Nearby on the register
- Discharge permits in Crystal Lake
- Every permit record in Crystal Lake, A to Z
- Discharge permits in Illinois
- Every permit record in Illinois, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
0.0% of the 35 storm water construction permits in Crystal Lake have a violation on file. The Spring Creek-Fox River subwatershed holds 21 NPDES permits, counting THREE OAKS ROAD IMPROVEMENTS.